Difference between revisions of "Prebuild Instructor Checklist"

From FreekiWiki
Jump to navigation Jump to search
Line 3: Line 3:
 
* Set up card sorting
 
* Set up card sorting
 
** get new cards to sort.
 
** get new cards to sort.
** pull out overflowing boxes that have been sorted
+
** pulling out overflowing boxes that have been sorted.
** post it notes and pens for labeling
+
* meta system movement - make sure systems stacked in a save manner.
** example RAM and motherboards
 
* meta system movement - make sure systems stacked in a safe manner.
 
* recycle labels
 
* keeper labels
 
 
* check tools
 
* check tools
** phillips and regular screwdrivers for eval 1 and 2
 
** power supply tester for eval 2
 
  
 
==Middle Shift==
 
==Middle Shift==

Revision as of 17:21, 11 January 2008

Opening Shift

  • Set up card sorting
    • get new cards to sort.
    • pulling out overflowing boxes that have been sorted.
  • meta system movement - make sure systems stacked in a save manner.
  • check tools

Middle Shift

  • restack systems to be the safest
  • move hard drives into advanced testing (lockup)
  • tools (in the future this may be like recycling's setup)
  • set up card sorting with new supplies of cards from the eval areas
    • if time do some advanced card sorting
    • coordinate with production when you see a need to change the flowcharts, or when they see a change in requirements, to change the flowcharts.

Closing Shift

  • make sure systems are stacked in a non threatening way, and in the correct spaces
  • make sure all hard drives have made it to advanced testing. (lockup)
  • turn off electronics
  • check tools