Difference between revisions of "Specific Options for Reducing Staffing Costs"
Jump to navigation
Jump to search
Line 29: | Line 29: | ||
TOTAL $3,792.00 | TOTAL $3,792.00 | ||
− | == Job performance based | + | == Job performance based cuts == |
*32 hour collective member with health care = $1867 | *32 hour collective member with health care = $1867 | ||
*32 hour collective member without health care = $1584 | *32 hour collective member without health care = $1584 | ||
*20 hour collective member with health care = $1339 | *20 hour collective member with health care = $1339 | ||
*20 hour collective member without health care = $1056 | *20 hour collective member without health care = $1056 |
Revision as of 14:37, 1 March 2005
This is part of the Reduction Committee Tasks.
As we review everything, we need to spell out what specific measures we could take. We'll need to estimate the financial costs and savings of each, the other costs (staffing shortages, impact on programs, etc.), and the problems associated with each option.
Target #1 = $2,700.
Target #2 = $5,400 (including target #1).
Across the board wage cut
A 5% wage cut would save us $1,162.58. We spend $23,250 / month on non health care benefits.
Voluntary hours cuts
Monthly cost of collective member/hour/week =
Per hr cost: $52.96 Dave 1.75 $92.68 Geiner 7 $370.72 Jhasen 10 $529.60 Jon 12 $635.52 Laurel 4.5 $238.32 Liane 4 $211.84 Martin 10 $529.60 Michael 5 $264.80 Rick 6 $317.76 Shawn 8 $423.68 SUBTOT 68.25 $3,614.52 Matthew 5 $175.00 TOTAL $3,792.00
Job performance based cuts
- 32 hour collective member with health care = $1867
- 32 hour collective member without health care = $1584
- 20 hour collective member with health care = $1339
- 20 hour collective member without health care = $1056