Difference between revisions of "Specific Options for Reducing Staffing Costs"

From FreekiWiki
Jump to navigation Jump to search
Line 29: Line 29:
 
  TOTAL        $3,792.00
 
  TOTAL        $3,792.00
  
== Job performance based costs ==
+
== Job performance based cuts ==
 
*32 hour collective member with health care = $1867
 
*32 hour collective member with health care = $1867
 
*32 hour collective member without health care = $1584
 
*32 hour collective member without health care = $1584
 
*20 hour collective member with health care = $1339
 
*20 hour collective member with health care = $1339
 
*20 hour collective member without health care = $1056
 
*20 hour collective member without health care = $1056

Revision as of 14:37, 1 March 2005

This is part of the Reduction Committee Tasks.

As we review everything, we need to spell out what specific measures we could take. We'll need to estimate the financial costs and savings of each, the other costs (staffing shortages, impact on programs, etc.), and the problems associated with each option.

Target #1 = $2,700.

Target #2 = $5,400 (including target #1).


Across the board wage cut

A 5% wage cut would save us $1,162.58. We spend $23,250 / month on non health care benefits.

Voluntary hours cuts

Monthly cost of collective member/hour/week =

Per hr cost: $52.96 
Dave    1.75    $92.68 
Geiner  7      $370.72 
Jhasen 10      $529.60 
Jon    12      $635.52 
Laurel  4.5    $238.32 
Liane   4      $211.84 
Martin 10      $529.60 
Michael 5      $264.80 
Rick    6      $317.76 
Shawn   8      $423.68 
SUBTOT 68.25 $3,614.52 
Matthew 5      $175.00
TOTAL        $3,792.00

Job performance based cuts

  • 32 hour collective member with health care = $1867
  • 32 hour collective member without health care = $1584
  • 20 hour collective member with health care = $1339
  • 20 hour collective member without health care = $1056