Difference between revisions of "Safety Calendar"

From FreekiWiki
Jump to navigation Jump to search
m
Line 94: Line 94:
 
* Electric Panels, Emergency Shut-offs - All Staff
 
* Electric Panels, Emergency Shut-offs - All Staff
  
;July
+
;September
 +
* Injury Logging Procedure - All Staff
 +
 
 +
;November (proposed)
 
* Mental Health Awareness (outside agency) - All Staff
 
* Mental Health Awareness (outside agency) - All Staff
  
 
[[Category:Action]][[Category:Safety]]
 
[[Category:Action]][[Category:Safety]]

Revision as of 10:38, 21 September 2012

NH Staff Trainings:

  • Emergency Exit
  • Volunteer and Staff Injury reporting
  • Alarms and Security


This is a calendar for upcoming and past safety training.

  • SM = Staff meeting
  • AS = All staff except some subs
  • SC = Staff Collective
  • NH = Newly Hired

2008

January
  • first aid / CPR training (off site - 1/2 SC)
February
March
April
May
June
July
August
September
  • Safety Policy update (SM)
October
November
December
  • Training volunteers is safety. (SM)

2009

January
  • Fire Extinguisher training (sm)
February
  • Evacuation Training. (sm)
March
  • first aid / CPR training (off site - 1/2 SC)
  • first aid kit (sm)
  • safety walk-through completed 3/7/09
April
  • electric hazards at Free Geek, incl. emergency shut off (AS)
May
  • ADA and Fire space allowances (sm)
June
  • safe lifting and moving (sm)
July
  • personal protective equipment at Free Geek (sm)
August
  • Fire Drill
September
  • safety around moving equipment (sm)
October
  • Evacuation Training (sm)
November
  • general safety awareness
December
  • no training

2010

January
  • no training
February
  • Fire Extinguisher training (sm)
March
  • Evacuation Training. (sm)
April
  • first aid / CPR training (new staff members only?)
May
  • electric hazards at Free Geek, incl. emergency shut off
June
  • ADA and Fire space allowances (sm)

2011

August
  • First Aid/CPR/BBP (8 staff, needs to be repeated)

2012

February
March
  • Proper Lifting procedures - All Staff
  • First Aid Procedure - All Staff
  • Blood Spill Procedure - All Staff
  • Emergency Evacuation Procedure, incl. Evacuation Drill - All Staff
  • Fire Extinguishers- how to use them - All Staff
  • Slips/Trips/Falls - All Staff
April
  • Personal Protective Equipment - All staff
May
  • CPR/First Aid/BBP(outside agency) - 8-10 staff
June
  • Electric Panels, Emergency Shut-offs - All Staff
September
  • Injury Logging Procedure - All Staff
November (proposed)
  • Mental Health Awareness (outside agency) - All Staff