Difference between revisions of "Beautification"

From FreekiWiki
Jump to navigation Jump to search
 
(15 intermediate revisions by 8 users not shown)
Line 1: Line 1:
We're going to clean things up a bit, so we are looking to identify areas that need minor repairs and a coat of paint. Please add to this list. ''Note: this list is not in order of priority, that will be decided when the list feels more complete.''
+
{{Delete}}
 
 
  
 +
We're going to clean things up a bit, so we are looking to identify areas that need minor repairs and a coat of paint. For info on a cleaning party (less structure, more scrubbin') see the [[Combatting Clutter]] page. Please add to this list. ''Note: this list is not in order of priority, that will be decided when the list feels more complete.''
  
 
=='''Meeting Room'''==
 
=='''Meeting Room'''==
Line 14: Line 14:
 
*paint walls
 
*paint walls
 
*new flooring??? (could be got for free as the bathrooms are not huge).
 
*new flooring??? (could be got for free as the bathrooms are not huge).
 +
** Crafty has a mosaic plan.
 
*secure/replace loose defective fixtures
 
*secure/replace loose defective fixtures
 
*solution for for soap and towels (lots fo options here)
 
*solution for for soap and towels (lots fo options here)
 
*create storage for bathroom supplies
 
*create storage for bathroom supplies
 +
*Fix fan in "men's" bathroom
  
 
=='''Staff Kitchen/Lounge'''==
 
=='''Staff Kitchen/Lounge'''==
 
*PURGE!!!
 
*PURGE!!!
 
*improve lighting and lighting controls
 
*improve lighting and lighting controls
 +
** crafty has plans
 
*paint walls
 
*paint walls
 
*trim and paint doors
 
*trim and paint doors
 
*improve cabinets/workspace
 
*improve cabinets/workspace
 +
*fix floor
 +
* install or ditch the oven
  
 
=='''Volunteer Kitchen'''==
 
=='''Volunteer Kitchen'''==
Line 40: Line 45:
 
*improve lighting and lighting controls
 
*improve lighting and lighting controls
 
*paint walls
 
*paint walls
 +
*add projector on class side
 +
 +
=='''Reception'''==
 +
*Rug or carpet samples: Either action will necessitate rolling chairs move easy enough to get around on
 +
*Presently the floor is being eroded away by chair wheels, causing lots of sawdust like flakes to exist everywhere
 +
*Hard plastic flooring might help
 +
*fix door between front desk area and receiving, it doesn't latch or stay shut
 +
 +
=='''Receiving/Basic Testing'''==
 +
* Fix holes in ceiling all down the hall
 +
* Sign regarding styrofoam
 +
* Shelving over basic testing for storage and for museum items
 +
 +
== Upstairs ==
 +
* Add on to floor for clasic game library and museum.
 +
* Add shelving for museum storage
 +
 +
== See Also ==
 +
* [[Combatting Clutter]]
  
 
[[Category: Places]]
 
[[Category: Places]]

Latest revision as of 15:06, 27 April 2013

deletion

This page has been requested to be deleted.
If you disagree, discuss on the talk page.
Whenever possible, could an Admin please remove this page?


We're going to clean things up a bit, so we are looking to identify areas that need minor repairs and a coat of paint. For info on a cleaning party (less structure, more scrubbin') see the Combatting Clutter page. Please add to this list. Note: this list is not in order of priority, that will be decided when the list feels more complete.

Meeting Room

  • paint walls
  • trim and paint doors
  • improve lighting and lighting controls
  • improve bar
  • improve meeting accessories (i.e. video projection, networking, telephone)
  • install door/vestibule to upstairs loft.

Bathrooms

  • paint walls
  • new flooring??? (could be got for free as the bathrooms are not huge).
    • Crafty has a mosaic plan.
  • secure/replace loose defective fixtures
  • solution for for soap and towels (lots fo options here)
  • create storage for bathroom supplies
  • Fix fan in "men's" bathroom

Staff Kitchen/Lounge

  • PURGE!!!
  • improve lighting and lighting controls
    • crafty has plans
  • paint walls
  • trim and paint doors
  • improve cabinets/workspace
  • fix floor
  • install or ditch the oven

Volunteer Kitchen

  • improve lighting and lighting controls
  • paint walls
  • improve cabinets/workspace

Lab

  • PURGE!!!
  • improve lighting and lighting controls
  • paint walls

Classroom

  • PURGE!!!
  • finish divider window wall
  • improve lighting and lighting controls
  • paint walls
  • add projector on class side

Reception

  • Rug or carpet samples: Either action will necessitate rolling chairs move easy enough to get around on
  • Presently the floor is being eroded away by chair wheels, causing lots of sawdust like flakes to exist everywhere
  • Hard plastic flooring might help
  • fix door between front desk area and receiving, it doesn't latch or stay shut

Receiving/Basic Testing

  • Fix holes in ceiling all down the hall
  • Sign regarding styrofoam
  • Shelving over basic testing for storage and for museum items

Upstairs

  • Add on to floor for clasic game library and museum.
  • Add shelving for museum storage

See Also