Difference between revisions of "Design and Construction"
Jump to navigation
Jump to search
| (2 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
| + | {{Delete}} | ||
| + | |||
| + | == Current Projects == | ||
| + | [[Beautification]] - Slappin a fresh coat o' paint on the ole facililty and fixin' all the little things (includes classroom/store divider). | ||
| + | |||
| + | == Proposed Projects == | ||
| + | |||
| + | |||
== Design History == | == Design History == | ||
| Line 20: | Line 28: | ||
:Plan | :Plan | ||
:Description | :Description | ||
| + | |||
| + | [[Category:Places]] | ||
Latest revision as of 14:10, 27 April 2013
|
This page has been requested to be deleted. |
Current Projects
Beautification - Slappin a fresh coat o' paint on the ole facililty and fixin' all the little things (includes classroom/store divider).
Proposed Projects
Design History
- PHASE ONE
- 5,000 SF
- Plan
- Description
- PHASE TWO
- 10,000 SF
- Plan
- Description
- PHASE TWO REVISED
- 15,000 SF + 1,500 SF sublet
- Plan
- Description
- PHASE THREE PROPOSAL
- 15,000 SF + 1,500 SF sublet
- Plan
- Description
