Difference between revisions of "Beautification"
Jump to navigation
Jump to search
(8 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
+ | {{Delete}} | ||
+ | |||
We're going to clean things up a bit, so we are looking to identify areas that need minor repairs and a coat of paint. For info on a cleaning party (less structure, more scrubbin') see the [[Combatting Clutter]] page. Please add to this list. ''Note: this list is not in order of priority, that will be decided when the list feels more complete.'' | We're going to clean things up a bit, so we are looking to identify areas that need minor repairs and a coat of paint. For info on a cleaning party (less structure, more scrubbin') see the [[Combatting Clutter]] page. Please add to this list. ''Note: this list is not in order of priority, that will be decided when the list feels more complete.'' | ||
Line 12: | Line 14: | ||
*paint walls | *paint walls | ||
*new flooring??? (could be got for free as the bathrooms are not huge). | *new flooring??? (could be got for free as the bathrooms are not huge). | ||
+ | ** Crafty has a mosaic plan. | ||
*secure/replace loose defective fixtures | *secure/replace loose defective fixtures | ||
*solution for for soap and towels (lots fo options here) | *solution for for soap and towels (lots fo options here) | ||
*create storage for bathroom supplies | *create storage for bathroom supplies | ||
+ | *Fix fan in "men's" bathroom | ||
=='''Staff Kitchen/Lounge'''== | =='''Staff Kitchen/Lounge'''== | ||
*PURGE!!! | *PURGE!!! | ||
*improve lighting and lighting controls | *improve lighting and lighting controls | ||
+ | ** crafty has plans | ||
*paint walls | *paint walls | ||
*trim and paint doors | *trim and paint doors | ||
*improve cabinets/workspace | *improve cabinets/workspace | ||
*fix floor | *fix floor | ||
+ | * install or ditch the oven | ||
=='''Volunteer Kitchen'''== | =='''Volunteer Kitchen'''== | ||
Line 45: | Line 51: | ||
*Presently the floor is being eroded away by chair wheels, causing lots of sawdust like flakes to exist everywhere | *Presently the floor is being eroded away by chair wheels, causing lots of sawdust like flakes to exist everywhere | ||
*Hard plastic flooring might help | *Hard plastic flooring might help | ||
+ | *fix door between front desk area and receiving, it doesn't latch or stay shut | ||
=='''Receiving/Basic Testing'''== | =='''Receiving/Basic Testing'''== | ||
* Fix holes in ceiling all down the hall | * Fix holes in ceiling all down the hall | ||
* Sign regarding styrofoam | * Sign regarding styrofoam | ||
− | * Shelving over basic testing | + | * Shelving over basic testing for storage and for museum items |
+ | |||
+ | == Upstairs == | ||
+ | * Add on to floor for clasic game library and museum. | ||
+ | * Add shelving for museum storage | ||
== See Also == | == See Also == |
Latest revision as of 15:06, 27 April 2013
This page has been requested to be deleted. |
We're going to clean things up a bit, so we are looking to identify areas that need minor repairs and a coat of paint. For info on a cleaning party (less structure, more scrubbin') see the Combatting Clutter page. Please add to this list. Note: this list is not in order of priority, that will be decided when the list feels more complete.
Meeting Room
- paint walls
- trim and paint doors
- improve lighting and lighting controls
- improve bar
- improve meeting accessories (i.e. video projection, networking, telephone)
- install door/vestibule to upstairs loft.
Bathrooms
- paint walls
- new flooring??? (could be got for free as the bathrooms are not huge).
- Crafty has a mosaic plan.
- secure/replace loose defective fixtures
- solution for for soap and towels (lots fo options here)
- create storage for bathroom supplies
- Fix fan in "men's" bathroom
Staff Kitchen/Lounge
- PURGE!!!
- improve lighting and lighting controls
- crafty has plans
- paint walls
- trim and paint doors
- improve cabinets/workspace
- fix floor
- install or ditch the oven
Volunteer Kitchen
- improve lighting and lighting controls
- paint walls
- improve cabinets/workspace
Lab
- PURGE!!!
- improve lighting and lighting controls
- paint walls
Classroom
- PURGE!!!
- finish divider window wall
- improve lighting and lighting controls
- paint walls
- add projector on class side
Reception
- Rug or carpet samples: Either action will necessitate rolling chairs move easy enough to get around on
- Presently the floor is being eroded away by chair wheels, causing lots of sawdust like flakes to exist everywhere
- Hard plastic flooring might help
- fix door between front desk area and receiving, it doesn't latch or stay shut
Receiving/Basic Testing
- Fix holes in ceiling all down the hall
- Sign regarding styrofoam
- Shelving over basic testing for storage and for museum items
Upstairs
- Add on to floor for clasic game library and museum.
- Add shelving for museum storage