Difference between revisions of "Safety Calendar"

From FreekiWiki
Jump to navigation Jump to search
(→‎2009: added tranings for jan and feb)
 
(13 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
NH Staff Trainings:
 +
* Emergency Exit
 +
* Volunteer and Staff Injury reporting
 +
* Alarms and Security
 +
 +
 +
 
This is a calendar for upcoming and past safety training.  
 
This is a calendar for upcoming and past safety training.  
 
* ''SM = Staff meeting''
 
* ''SM = Staff meeting''
 
* ''AS = All staff except some subs''
 
* ''AS = All staff except some subs''
 
* ''SC = Staff Collective''
 
* ''SC = Staff Collective''
 +
* ''NH = Newly Hired ''
  
 
== 2008 ==
 
== 2008 ==
Line 23: Line 31:
 
== 2009 ==
 
== 2009 ==
 
;January
 
;January
* first aid / CPR traning (off site - 1/2 SC)
+
* Fire Extinguisher training (sm)
* Fire Extinguisher traning (sm)
 
 
;February
 
;February
 
* Evacuation Training. (sm)  
 
* Evacuation Training. (sm)  
 
;March
 
;March
 +
* first aid / CPR training (off site - 1/2 SC)
 +
* first aid kit (sm)
 +
* safety walk-through completed 3/7/09
 
;April
 
;April
 +
* electric hazards at Free Geek, incl. emergency shut off (AS)
 
;May
 
;May
 +
* ADA and Fire space allowances (sm)
 
;June
 
;June
 +
* safe lifting and moving (sm)
 
;July
 
;July
 +
* personal protective equipment at Free Geek (sm)
 
;August
 
;August
 +
* Fire Drill
 
;September
 
;September
 +
* safety around moving equipment (sm)
 
;October
 
;October
 +
* Evacuation Training (sm)
 
;November
 
;November
 +
* general safety awareness
 
;December
 
;December
 +
* no training
 +
 +
== 2010 ==
 +
;January
 +
* no training
 +
;February
 +
*Fire Extinguisher training (sm)
 +
;March
 +
*Evacuation Training. (sm)
 +
;April
 +
*first aid / CPR training (new staff members only?)
 +
;May
 +
*electric hazards at Free Geek, incl. emergency shut off
 +
;June
 +
*ADA and Fire space allowances (sm)
 +
 +
==2011==
 +
;August
 +
* First Aid/CPR/BBP (8 staff, needs to be repeated)
 +
 +
==2012==
 +
;February
 +
; March
 +
* Proper Lifting procedures - All Staff
 +
* First Aid Procedure - All Staff
 +
* Blood Spill Procedure - All Staff
 +
* Emergency Evacuation Procedure, incl. Evacuation Drill - All Staff
 +
* Fire Extinguishers- how to use them - All Staff
 +
* Slips/Trips/Falls - All Staff
 +
 +
;April
 +
* Personal Protective Equipment - All staff
 +
 +
;May
 +
* CPR/First Aid/BBP(outside agency) - 8-10 staff
 +
 +
;June
 +
* Electric Panels, Emergency Shut-offs - All Staff
 +
 +
;September
 +
* Injury Logging Procedure - All Staff
 +
 +
;November (proposed)
 +
* Mental Health Awareness (outside agency) - All Staff
 +
 +
==2013==
 +
January
 +
* Fire Marshal Inspection report
 +
* Using a Fire Extinguisher Training
 +
 +
March
 +
 +
June
 +
* Skip/Trip/Fall Hazards
 +
* New Fire Extinguisher installed
 +
* Keeping main hallways free from obstructions (emergency exit ways)
 +
* Injury Logging Procedure (carry over from March)
 +
 +
October
 +
* Emergency Exits Maps
 +
* Fire Safety
 +
* Keeping Walkways Clear
 +
* Preventing Trips, Slips and Falls (Incident response)
  
 
[[Category:Action]][[Category:Safety]]
 
[[Category:Action]][[Category:Safety]]

Latest revision as of 13:58, 18 December 2013

NH Staff Trainings:

  • Emergency Exit
  • Volunteer and Staff Injury reporting
  • Alarms and Security


This is a calendar for upcoming and past safety training.

  • SM = Staff meeting
  • AS = All staff except some subs
  • SC = Staff Collective
  • NH = Newly Hired

2008

January
  • first aid / CPR training (off site - 1/2 SC)
February
March
April
May
June
July
August
September
  • Safety Policy update (SM)
October
November
December
  • Training volunteers is safety. (SM)

2009

January
  • Fire Extinguisher training (sm)
February
  • Evacuation Training. (sm)
March
  • first aid / CPR training (off site - 1/2 SC)
  • first aid kit (sm)
  • safety walk-through completed 3/7/09
April
  • electric hazards at Free Geek, incl. emergency shut off (AS)
May
  • ADA and Fire space allowances (sm)
June
  • safe lifting and moving (sm)
July
  • personal protective equipment at Free Geek (sm)
August
  • Fire Drill
September
  • safety around moving equipment (sm)
October
  • Evacuation Training (sm)
November
  • general safety awareness
December
  • no training

2010

January
  • no training
February
  • Fire Extinguisher training (sm)
March
  • Evacuation Training. (sm)
April
  • first aid / CPR training (new staff members only?)
May
  • electric hazards at Free Geek, incl. emergency shut off
June
  • ADA and Fire space allowances (sm)

2011

August
  • First Aid/CPR/BBP (8 staff, needs to be repeated)

2012

February
March
  • Proper Lifting procedures - All Staff
  • First Aid Procedure - All Staff
  • Blood Spill Procedure - All Staff
  • Emergency Evacuation Procedure, incl. Evacuation Drill - All Staff
  • Fire Extinguishers- how to use them - All Staff
  • Slips/Trips/Falls - All Staff
April
  • Personal Protective Equipment - All staff
May
  • CPR/First Aid/BBP(outside agency) - 8-10 staff
June
  • Electric Panels, Emergency Shut-offs - All Staff
September
  • Injury Logging Procedure - All Staff
November (proposed)
  • Mental Health Awareness (outside agency) - All Staff

2013

January

  • Fire Marshal Inspection report
  • Using a Fire Extinguisher Training

March

June

  • Skip/Trip/Fall Hazards
  • New Fire Extinguisher installed
  • Keeping main hallways free from obstructions (emergency exit ways)
  • Injury Logging Procedure (carry over from March)

October

  • Emergency Exits Maps
  • Fire Safety
  • Keeping Walkways Clear
  • Preventing Trips, Slips and Falls (Incident response)