Difference between revisions of "Where are the light switches?"
Jump to navigation
Jump to search
Halfasspete (talk | contribs) |
(Old howto move (Template)) |
||
Line 1: | Line 1: | ||
− | + | {{Old howto move}} | |
− | + | FREE GEEK Opening HOWTO | |
− | |||
Instructions for opening Free Geek. | Instructions for opening Free Geek. |
Revision as of 18:40, 26 December 2005
FREE GEEK Opening HOWTO
Instructions for opening Free Geek. Quick Guide:
* Turn lights on * Get data entry terminals up and running. This applies to Receiving, Walkin, and Build: o Turn on o Log in o Start browser o Verify that the home page comes up (and works) * The front desk computer should be up and running. * The store computer should be up and running. * Make sure two classroom terminals are turned on. * Make sure the classroom printers are turned on. * There should be schedules for member shifts for the next week at front desk. * Put tally sheets at all testing stations. * Check the "FreekBoxen on hand" sheets: o On Ready for Adoption shelf o Near Ready for QC pile Count FreekBoxen, make sure sheets are up to date, and note math anomalies.
Detailed Instructions
Where are the light switches?
* In recycling, there is an electrical box with a bunch of switches in it. One of them is covered with glow in the dark greenish tape. That's the light switch for recycling. * In the storage room, there is an pull string on the back ceiling light. * In the imaging area, there's a switch on the pillar in the middle of imaging bench. * In the build room, look on the south wall (inside the shelves!) * The classroom lights are on the hallway wall near the bathroom. * The back room lights are in the classroom to the right of the double doors to the back room. * In the entryways (both sides) switches are near to the receiving terminal. These control the store, the offices, the testing room, receiving, and the front desk area.
Pointers
Cash Drawer Accounting
Back to HOWTO Main Page