Difference between revisions of "Facility"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
*Isles must have a clearance of 42 inches across | *Isles must have a clearance of 42 inches across | ||
*No daisy chaining of electrical power strips | *No daisy chaining of electrical power strips | ||
− | * hole in walls and | + | * hole in walls and ceilings must be patched |
====Power Panel Locations==== | ====Power Panel Locations==== | ||
*All power panels must be kept clear and accessable minimum of 48 inches clearance around them. | *All power panels must be kept clear and accessable minimum of 48 inches clearance around them. |
Revision as of 12:30, 23 February 2007
Fire Inspection Checklist
General Work Areas
- Isles must have a clearance of 42 inches across
- No daisy chaining of electrical power strips
- hole in walls and ceilings must be patched
Power Panel Locations
- All power panels must be kept clear and accessable minimum of 48 inches clearance around them.
Fire Exits
- Fire exits must be lit with a clearly defined lighted exit sign with battery backup. These units are powered from house power and should stay on at all times.
Fire extinguishers
- These must be checked annually. The tags must reflect an inspection has been performed in the calendar year.
Maintainance Logs
Fire Extinguishers
- Vendor
- United Fire & Safety
- xxxxx N MLK Blvd.
- Portland, OR 972xx
- FE Log
- Inspection tags good for one year.
Location | Type | Inspection Date |
Lab | ABC | December 2004 |
Kitchen | ABC | December 2004 |
Build | ABC | December 2004 |
Printerland | ABC | December 2004 |
Evaluation | ABC | December 2004 |
Recycling | ABC | December 2004 |
HVAC
UNIT INFO
- [units listed from north to south]
UNIT ONE [Warehouse]
- Located in the Warehouse, next to the door from Advanced Testing.
- Thermostat is manual, on west side of a pillar, near the front, obscured by shelving.
- Day & Night Co. Model 394GAW060175
- Gas Unit with no Air Conditioning. Gas line runs through Black Hole, then along back wall through Eval, Build, :Back Stage, and out near rollup door. Facing meters, it is the one on the right.
- Gas valves are located at the unit and at the meter.
- Electrical switch is at the unit. Electical is fed from ?
UNIT TWO [Receiving]
- Located in the attic space above Receiving, with air conditioning condenser on roof.
- Thermostat is programable, on west wall of Receiving.
- Electric Furnace, fed from?
- Currently disabled, pending attic area remodel. ( noted 10/15/06)
UNIT THREE [Evaluation]
- Located on ceiling above Eval.
- Electric furnace, fed from panel on north wall of eval.
- Air conditioning ?
- Thermostat Programable, located on East wall of Eval II.
UNIT FOUR [Store]
- Located above bathroom in Admin/Lab area.
- Gas? Has air conditioning.
- Thermostat programable, located on north wall of Thrift Store.
UNIT FIVE [Admin/Lab]
- On roof above Lab.
- Serves all of space from Reception to Build.
- Gas unit with air conditioning.
- Gas runs accross roof, shut offs at unit and meter.
- Meter at south rollup door, is second to left,facing meters, same meter feeds other units. (will document which units later).
- Thermostat is programable, located on south wall of Lab.
UNIT SIX [Classroom]
- On roof above Store
- Gas unit with air conditioning
- Gas shut off's at roof unit, and at south rollup door,meter second to left, facing meters, shared by other units (to be documented later).
- Thermostat programable, located on north wall of the classroom near the door to Lab.
UNIT SEVEN [Meeting Room]
- Located in Art Studio above Meeting Room.
- Electric? with air conditioning. Condenser located on roof? (need art stuff moved to access unit to clarify)
- Thermostat manual, located on west wall in Library, next to Meeting Room door.
THERMOSTATS
- Locations listed in Unit Info above.
- Batteries in programable thermostats should be changed annually
- Month ?
- Two AA batteries each?
FILTERS
- Vendors
- Honke Heating, Gresham, 503-666-3725
- Fred Meyer
- True Value Hardware
- Filter Log
- Filters should be changed 2 times per year.
Location | Size | Date |
Unit One: Warehouse | ??x?? | ??? |
Unit Two: Receiving | ??x?? | ??? |
Unit Three: Eval | ??x?? | ??? |
Unit Four: Store | ??x?? | June 2004 |
Unit Five: Admin/Lab | ??x?? | ??? |
Unit Six: Classroom | ??x?? | ??? |
Unit Seven: Meeting Room | ??x?? | ??? |
upstairs remodel
Purpose
The purpose of the remodel is to finish the floor in old printerland.
The project is funded by a personal grant for the classic gaming library.
Scope of work to be done
We are going to add floor Joists to strengthen the structure of the floor and add flooring to the rest of the space. The work will be done to code specifications. The furnace will be relocated and duct work rerouted as needed.
To do Tasks
- clear all equipment from work area
- store in big classroom
- roll up insulation and bag for reinstallation
- Store in big classroom
- reroute electrical
- uninstall furnace
- remove existing blocking
- add new joists and shore up beams
- allow for Cable infrastructure (cable trays and trap door access)
- Cable for Network
- allow for Cable infrastructure (cable trays and trap door access)
- blocking reinstalled where needed
- HVAC ducting in floor
- Sheet floor
- vented Closet for Heating
- Add walls
- at least one wall to contain the CGL
- Move equipment from platform (museum)
- remove floor 1x12 existing
- sheet floor