Difference between revisions of "SCSI Hard Drive Triage"

From FreekiWiki
Jump to navigation Jump to search
m
m (re-categorized)
Line 72: Line 72:
 
: Take them to the warehouse and put them in the POWER SUPPLIES TO RECYCLE location
 
: Take them to the warehouse and put them in the POWER SUPPLIES TO RECYCLE location
  
[[Category: Advanced Test]]
+
[[Category: Advanced Testing]]

Revision as of 17:17, 16 September 2008

SCSI Hard Drive sorting is done in Advanced Test.

Start

copied from ps triage, not done yet.

We sort mostly by size & speed, but also serve special requests from buyers.

Follow the triage flow chart below to determine which pile to put the power supply in. You will need to test some power supplies to complete this task.

Triage Chart

This is a graph with borders and nodes. Maybe there is an Imagemap used so the nodes may be linking to some Pages.

Testing Power Supplies

Use a standard ATX power supply tester for a 20 pin ATX power supply. If you have a 24 pin ATX power supply, send it to advanced testing instead.

For each power supply that needs to be tested, do these things:

  1. Plug each power supply into outlet
  2. If there is a rear power supply switch, make sure it is turned on.
  3. Connect the tester to the 20 pin ATX connector
    • Check lights (all lights on is good, but it is also OK if the -5V light is off)
  4. Connect the tester to the 4 pin ATX connector
    • Check to see if the +12V light is on

What to do when done, where to put them

Keepers
Mark them small smiley face in a corner on the side where the wires come out with a sharpie
Take them to the warehouse and put them in the POWER SUPPLIES TO KEEP location
Recycle
Mark them LARGE frowny face somewhere with a sharpie
Take them to the warehouse and put them in the POWER SUPPLIES TO RECYCLE location