Difference between revisions of "Facility"

From FreekiWiki
Jump to navigation Jump to search
(→‎Fire Inspection Checklist: changed to general inspection checklist)
Line 29: Line 29:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Lab</td>
+
<td>Lab/build</td>
 
<td>ABC</td>
 
<td>ABC</td>
<td>December 2004</td>
+
<td>February 2006 (service)</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Kitchen</td>
+
<td>Kitchen (volunteer)</td>
 
<td>ABC</td>
 
<td>ABC</td>
<td>December 2004</td>
+
<td>February 2006 (service)</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Build</td>
+
<td>Kitchen (Staff)</td>
 
<td>ABC</td>
 
<td>ABC</td>
<td>December 2004</td>
+
<td>August 2006 (new)</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Printerland</td>
+
<td>Kens space (down stares)</td>
 
<td>ABC</td>
 
<td>ABC</td>
<td>December 2004</td>
+
<td>NONE YET</td>
</tr>
 
 
<tr>
 
<tr>
 
<td>Evaluation</td>
 
<td>Evaluation</td>
 
<td>ABC</td>
 
<td>ABC</td>
<td>December 2004</td>
+
<td>February 2006 (service)</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Recycling</td>
 
<td>Recycling</td>
 
<td>ABC</td>
 
<td>ABC</td>
<td>December 2004</td>
+
<td>Augest 2006 (New)</td>
 
</tr>
 
</tr>
 
</table>
 
</table>

Revision as of 15:48, 6 April 2007

General Inspection Checklist

General Work Areas

  • Isles must have a clearance of 42 inches across
  • No daisy chaining of electrical power strips
  • hole in walls and ceilings must be patched

Power Panel Locations

  • All power panels must be kept clear and accessable minimum of 48 inches clearance around them.

Fire Exits

  • Fire exits must be lit with a clearly defined lighted exit sign with battery backup. These units are powered from house power and should stay on at all times.

Fire extinguishers

  • These must be checked annually. The tags must reflect an inspection has been performed in the calendar year.

Maintainance Logs

Fire Extinguishers

Vendor
United Fire & Safety
xxxxx N MLK Blvd.
Portland, OR 972xx
FE Log
Inspection tags good for one year.
Location Type Inspection Date
Lab/build ABC February 2006 (service)
Kitchen (volunteer) ABC February 2006 (service)
Kitchen (Staff) ABC August 2006 (new)
Kens space (down stares) ABC NONE YET
Evaluation ABC February 2006 (service)
Recycling ABC Augest 2006 (New)

HVAC

UNIT INFO

units listed from north to south

UNIT ONE [Warehouse]
Located in the Warehouse, next to the door from Advanced Testing.
Serves
Thermostat is manual, on west side of a pillar, near the front, obscured by shelving.
Model Day & Night Co. Model 394GAW060175
Gas valves are located at the unit and at the meter.Gas line runs through Black Hole, then along back wall through Eval, Build, Back Stage, and out near rollup door. Facing meters, it is the one on the right.
Electrical switch is at the unit. Fed from ?
Info -Gas Unit with no Air Conditioning.
UNIT TWO [Receiving]
Located in the attic space above Receiving, with air conditioning condenser on roof.
Serves
Thermostat is programable, on west wall of Receiving.
Model
Gas
Electric Furnace, fed from?
Info - Currently disabled, (make an rt ticket)
UNIT THREE [Evaluation]
Located on ceiling above Eval.
Serves
Thermostat Programmable, located on East wall of Eval II.
Model - Day & Night - 394GAW060175
Gas
Electric furnace, fed from panel on north wall of eval.
Info - Air conditioning?
UNIT FOUR [Store]
Located above bathroom in Admin/Lab area.
Serves
Thermostat programable, located on north wall of Thrift Store.
Model
Gas?
Electric
Info - Has air conditioning.
UNIT FIVE [Admin/Lab]
Located On roof above Lab.
Serves all of space from Reception to Build.
Thermostat is programable, located on south wall of Lab.
Model -
Gas runs accross roof, shut offs at unit and meter. Meter at south rollup door, is second to left,facing meters, same meter feeds other units. (will document which units later).
Electric
Info - Gas unit with air conditioning.
UNIT SIX [Classroom]
Located On roof above Store
Serves
Thermostat programable, located on north wall of the classroom near the door to Lab.
Model
Gas shut off's at roof unit, and at south rollup door,meter second to left, facing meters, shared by other units (to be documented later).
Electric
Info - Gas unit with air conditioning

check drain above store

UNIT SEVEN [Meeting Room]
Located in Art Studio above Meeting Room.
Serves
Thermostat manual, located on west wall in Library, next to Meeting Room door.
Model
Gas
Electric? with air conditioning. Condenser located on roof? (need art stuff moved to access unit to clarify)
Info -

THERMOSTATS

Locations listed in Unit Info above.
Batteries in programable thermostats should be changed annually
Month ?
Two AA batteries each?

FILTERS

Vendors
Honke Heating, Gresham, 503-666-3725
Fred Meyer
True Value Hardware
Filter Log
Filters should be changed 2 times per year.
HEPA Filter?
Location Size Date
Unit One: Warehouse 28X30 missing
Unit Two: Receiving ??x?? disabled
Unit Three: Eval 12X21 need to replace
Unit Four: Store ??x?? June 2004
Unit Five: Admin/Lab ??x?? ???
Unit Six: Classroom ??x?? ???
Unit Seven: Meeting Room ??x?? ???