Difference between revisions of "Prebuild Instructor Checklist"
Jump to navigation
Jump to search
(always start levels with two == signs, not one!) |
(incorporating Matteo's suggestions (from email)) |
||
Line 1: | Line 1: | ||
− | == | + | ==Opening Shift== |
− | |||
− | + | * Set up card sorting | |
+ | ** get new cards to sort. | ||
+ | ** pulling out overflowing boxes that have been sorted. | ||
+ | * meta system movement - make sure systems stacked in a save manner. | ||
+ | * check tools | ||
− | + | ==Middle Shift== | |
+ | * restack systems to be the safest | ||
+ | * move hard drives into advanced testing (lockup) | ||
+ | * tools (in the future this may be like recycling's setup) | ||
+ | * set up card sorting with new supplies of cards from the eval areas | ||
+ | ** if time do some advanced card sorting | ||
+ | ** coordinate with production when you see a need to change the flowcharts, or when they see a change in requirements, to change the flowcharts. | ||
− | == | + | ==Closing Shift== |
− | + | * make sure systems are stacked in a non threatening way, and in the correct spaces | |
− | + | * make sure all hard drives have made it to advanced testing. (lockup) | |
− | + | * turn off electronics | |
− | + | * check tools | |
− | Closing Shift | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
[[Category:Instructor Checklist]] | [[Category:Instructor Checklist]] |
Revision as of 17:09, 11 January 2008
Opening Shift
- Set up card sorting
- get new cards to sort.
- pulling out overflowing boxes that have been sorted.
- meta system movement - make sure systems stacked in a save manner.
- check tools
Middle Shift
- restack systems to be the safest
- move hard drives into advanced testing (lockup)
- tools (in the future this may be like recycling's setup)
- set up card sorting with new supplies of cards from the eval areas
- if time do some advanced card sorting
- coordinate with production when you see a need to change the flowcharts, or when they see a change in requirements, to change the flowcharts.
Closing Shift
- make sure systems are stacked in a non threatening way, and in the correct spaces
- make sure all hard drives have made it to advanced testing. (lockup)
- turn off electronics
- check tools