Difference between revisions of "Prebuild Instructor Checklist"

From FreekiWiki
Jump to navigation Jump to search
(always start levels with two == signs, not one!)
(incorporating Matteo's suggestions (from email))
Line 1: Line 1:
==Card/Motherboard Sorting==
+
==Opening Shift==
Opening Shift:
 
  
Middle Shift:
+
* Set up card sorting
 +
** get new cards to sort.
 +
** pulling out overflowing boxes that have been sorted.
 +
* meta system movement - make sure systems stacked in a save manner.
 +
* check tools
  
Closing Shift:
+
==Middle Shift==
 +
* restack systems to be the safest
 +
* move hard drives into advanced testing (lockup)
 +
* tools (in the future this may be like recycling's setup)
 +
* set up card sorting with new supplies of cards from the eval areas
 +
** if time do some advanced card sorting
 +
** coordinate with production when you see a need to change the flowcharts, or when they see a change in requirements, to change the flowcharts.
  
==Eval 1==
+
==Closing Shift==
Opening Shift:
+
* make sure systems are stacked in a non threatening way, and in the correct spaces
 
+
* make sure all hard drives have made it to advanced testing. (lockup)
Middle Shift:
+
* turn off electronics
 
+
* check tools
Closing Shift:
 
 
 
==Eval 2==
 
Opening Shift:
 
 
 
Middle Shift:
 
 
 
Closing Shift:
 
  
  
 
[[Category:Instructor Checklist]]
 
[[Category:Instructor Checklist]]

Revision as of 17:09, 11 January 2008

Opening Shift

  • Set up card sorting
    • get new cards to sort.
    • pulling out overflowing boxes that have been sorted.
  • meta system movement - make sure systems stacked in a save manner.
  • check tools

Middle Shift

  • restack systems to be the safest
  • move hard drives into advanced testing (lockup)
  • tools (in the future this may be like recycling's setup)
  • set up card sorting with new supplies of cards from the eval areas
    • if time do some advanced card sorting
    • coordinate with production when you see a need to change the flowcharts, or when they see a change in requirements, to change the flowcharts.

Closing Shift

  • make sure systems are stacked in a non threatening way, and in the correct spaces
  • make sure all hard drives have made it to advanced testing. (lockup)
  • turn off electronics
  • check tools