Difference between revisions of "Prebuild Instructor Checklist"

From FreekiWiki
Jump to navigation Jump to search
(incorporating Matteo's suggestions (from email))
Line 3: Line 3:
 
* Set up card sorting
 
* Set up card sorting
 
** get new cards to sort.
 
** get new cards to sort.
** pulling out overflowing boxes that have been sorted.
+
** pull out overflowing boxes that have been sorted
* meta system movement - make sure systems stacked in a save manner.
+
** post it notes and pens for labeling
 +
** example RAM and motherboards
 +
* meta system movement - make sure systems stacked in a safe manner.
 +
* recycle labels
 +
* keeper labels
 
* check tools
 
* check tools
 +
** phillips and regular screwdrivers for eval 1 and 2
 +
** power supply tester for eval 2
  
 
==Middle Shift==
 
==Middle Shift==

Revision as of 17:20, 11 January 2008

Opening Shift

  • Set up card sorting
    • get new cards to sort.
    • pull out overflowing boxes that have been sorted
    • post it notes and pens for labeling
    • example RAM and motherboards
  • meta system movement - make sure systems stacked in a safe manner.
  • recycle labels
  • keeper labels
  • check tools
    • phillips and regular screwdrivers for eval 1 and 2
    • power supply tester for eval 2

Middle Shift

  • restack systems to be the safest
  • move hard drives into advanced testing (lockup)
  • tools (in the future this may be like recycling's setup)
  • set up card sorting with new supplies of cards from the eval areas
    • if time do some advanced card sorting
    • coordinate with production when you see a need to change the flowcharts, or when they see a change in requirements, to change the flowcharts.

Closing Shift

  • make sure systems are stacked in a non threatening way, and in the correct spaces
  • make sure all hard drives have made it to advanced testing. (lockup)
  • turn off electronics
  • check tools