Difference between revisions of "Prebuild Instructor Checklist"

From FreekiWiki
Jump to navigation Jump to search
(added matteo's notes and some of my own)
Line 1: Line 1:
==Opening Shift==
+
= General Stuff =
 +
* Introduce yourself and let the volunteers know when you are ending your shift (introduce them to the next person, if possible)
 +
* Follow what each volunteer is doing to make sure he/she is doing it right
 +
:* Ask frequent questions like "Where are you on the chart?"
 +
* Make sure the volunteers understand how to test out
 +
* Make sure that volunteers are familiar with the goals of each section
 +
* Remind volunteers to take the Command Line class and that it's a necessary step before starting Build
  
* Set up card sorting
+
= Opening Shift =
** get new cards to sort.
+
* Set up cardsorting
** pulling out overflowing boxes that have been sorted.
+
:* Clear off work space
* meta system movement - make sure systems stacked in a save manner.
+
:* Get new cards to sort from Receiving and Eval
* check tools
+
:* Take overflowing boxes (that have been sorted) to their appropriate places
 +
* Meta Triage - make sure systems are stacked in a safe manner
 +
* Check the cart
 +
:* Does it need to be sent to the warehouse?
 +
:* Are there parts that haven't been removed
 +
* See if any of the card sorters can be tested out right away
 +
* Does anyone else want to test out?
  
==Middle Shift==
+
= Middle Shift =
* restack systems to be the safest
+
* Restack systems to be the safest
* move hard drives into advanced testing (lockup)
+
* Move hard drives into advanced testing for lockup
* tools (in the future this may be like recycling's setup)
+
* Tools (in the future this may be like recycling setup)
* set up card sorting with new supplies of cards from the eval areas
+
* Take card boxes from Eval 1 & 2 to Card Sorting
** if time do some advanced card sorting
+
* If there's time, do some advanced card sorting
** coordinate with production when you see a need to change the flowcharts, or when they see a change in requirements, to change the flowcharts.
+
* Coordinate with production when you see a need to change the flowcharts
 +
* Replace flowcharts if necessary
 +
* Check the cart
 +
:* Does it need to be sent to the warehouse?
 +
:* Are there parts that haven't been removed
 +
* Does anyone want to test out?
 +
* Empty the trash & recycling bins
 +
 
 +
= Closing Shift =
 +
* Make sure systems are stacked in a safe manner and in the correct spaces
 +
* Make sure all hard drives have made it to advanced testing for lockup
 +
* Turn off hardware in Eval 2
 +
* Turn off stereo
 +
* Check tools
 +
* Move memory into Advanced Testing
 +
* Check the cart
 +
:* Does it need to be sent to the warehouse?
 +
:* Are there parts that haven't been removed
 +
* Does anyone want to test out?
 +
* Remove all debris from recycled systems (stick it in recycled systems on cart, if possible)
 +
* Make sure Card Sorting and Eval are clean and ready for the next day
  
==Closing Shift==
 
* make sure systems are stacked in a non threatening way, and in the correct spaces
 
* make sure all hard drives have made it to advanced testing. (lockup)
 
* turn off electronics
 
* check tools
 
  
  
 
[[Category:Instructor Checklist]]
 
[[Category:Instructor Checklist]]

Revision as of 17:21, 11 January 2008

General Stuff

  • Introduce yourself and let the volunteers know when you are ending your shift (introduce them to the next person, if possible)
  • Follow what each volunteer is doing to make sure he/she is doing it right
  • Ask frequent questions like "Where are you on the chart?"
  • Make sure the volunteers understand how to test out
  • Make sure that volunteers are familiar with the goals of each section
  • Remind volunteers to take the Command Line class and that it's a necessary step before starting Build

Opening Shift

  • Set up cardsorting
  • Clear off work space
  • Get new cards to sort from Receiving and Eval
  • Take overflowing boxes (that have been sorted) to their appropriate places
  • Meta Triage - make sure systems are stacked in a safe manner
  • Check the cart
  • Does it need to be sent to the warehouse?
  • Are there parts that haven't been removed
  • See if any of the card sorters can be tested out right away
  • Does anyone else want to test out?

Middle Shift

  • Restack systems to be the safest
  • Move hard drives into advanced testing for lockup
  • Tools (in the future this may be like recycling setup)
  • Take card boxes from Eval 1 & 2 to Card Sorting
  • If there's time, do some advanced card sorting
  • Coordinate with production when you see a need to change the flowcharts
  • Replace flowcharts if necessary
  • Check the cart
  • Does it need to be sent to the warehouse?
  • Are there parts that haven't been removed
  • Does anyone want to test out?
  • Empty the trash & recycling bins

Closing Shift

  • Make sure systems are stacked in a safe manner and in the correct spaces
  • Make sure all hard drives have made it to advanced testing for lockup
  • Turn off hardware in Eval 2
  • Turn off stereo
  • Check tools
  • Move memory into Advanced Testing
  • Check the cart
  • Does it need to be sent to the warehouse?
  • Are there parts that haven't been removed
  • Does anyone want to test out?
  • Remove all debris from recycled systems (stick it in recycled systems on cart, if possible)
  • Make sure Card Sorting and Eval are clean and ready for the next day