Difference between revisions of "Prebuild Instructor Checklist"

From FreekiWiki
Jump to navigation Jump to search
Line 31: Line 31:
 
* Replace flowcharts if necessary
 
* Replace flowcharts if necessary
 
* Check the cart
 
* Check the cart
:* Does it need to be sent to the warehouse?
+
** Does it need to be sent to the warehouse?
:* Are there parts that haven't been removed
+
** Are there parts that haven't been removed?
 +
** Try to send the cart over before the morning shift leaves, even if it's not full. (This prevents the afternoon folks from having to correct the morning folks' mistakes.)
 
* Does anyone want to test out?
 
* Does anyone want to test out?
 
* Empty the trash & recycling bins
 
* Empty the trash & recycling bins

Revision as of 19:00, 11 January 2008

General Stuff

  • Introduce yourself and let the volunteers know when you are ending your shift (introduce them to the next person, if possible)
  • Always keep in mind that most students are here to get through prebuild so they can move on to build.
  • Follow what each volunteer is doing to make sure he/she is doing it right
  • Ask frequent questions like "Where are you on the chart?"
  • Make sure the volunteers understand how to test out
  • Make sure that volunteers are familiar with the goals of each section
  • Remind volunteers to take the Command Line class and that it's a necessary step before starting Build
  • Encourage people to teach each other. When testing folks out of one step, usually do this by observing the student showing a newbie how to do the job.
    • (Occasionally, there will be students that have learned the job satisfactorily but will not be able to teach someone -- e.g. they don't speak English well enough.)

Opening Shift

  • Clear off work space
  • Get new cards to sort from Receiving and Eval
  • Take overflowing boxes (that have been sorted) to their appropriate places
  • Meta Triage - make sure systems are stacked in a safe manner and there are enough incoming systems for each area
  • Check the cart
  • Does it need to be sent to the warehouse?
  • Are there parts that haven't been removed
  • See if any of the card sorters can be tested out right away
  • Does anyone else want to test out?

Middle Shift

  • Restack systems to be the safest
  • Move hard drives into advanced testing for lockup
  • Tools (in the future this may be like recycling setup)
  • Take card boxes from Eval 1 & 2 to Card Sorting
  • If there's time, do some advanced card sorting
  • Coordinate with production when you see a need to change the flowcharts
  • Replace flowcharts if necessary
  • Check the cart
    • Does it need to be sent to the warehouse?
    • Are there parts that haven't been removed?
    • Try to send the cart over before the morning shift leaves, even if it's not full. (This prevents the afternoon folks from having to correct the morning folks' mistakes.)
  • Does anyone want to test out?
  • Empty the trash & recycling bins

Closing Shift

  • Make sure systems are stacked in a safe manner and in the correct spaces
  • Make sure all hard drives have made it to advanced testing for lockup
  • Turn off hardware in Eval 2
  • Turn off stereo
  • Check tools
  • Move memory into Advanced Testing
  • Check the cart
  • Does it need to be sent to the warehouse?
  • Are there parts that haven't been removed
  • Does anyone want to test out?
  • Remove all debris from recycled systems (stick it in recycled systems on cart, if possible)
  • Make sure Card Sorting and Eval are clean and ready for the next day