Where are the light switches?

From FreekiWiki
Revision as of 18:40, 26 December 2005 by Matteo (talk | contribs) (Old howto move (Template))
Jump to navigation Jump to search

Template:Old howto move


FREE GEEK Opening HOWTO

Instructions for opening Free Geek. Quick Guide:

   * Turn lights on
   * Get data entry terminals up and running. This applies to Receiving, Walkin, and Build:
         o Turn on
         o Log in
         o Start browser
         o Verify that the home page comes up (and works)
   * The front desk computer should be up and running.
   * The store computer should be up and running.
   * Make sure two classroom terminals are turned on.
   * Make sure the classroom printers are turned on.
   * There should be schedules for member shifts for the next week at front desk.
   * Put tally sheets at all testing stations.
   * Check the "FreekBoxen on hand" sheets:
         o On Ready for Adoption shelf
         o Near Ready for QC pile
     Count FreekBoxen, make sure sheets are up to date, and note math anomalies.

Detailed Instructions

Where are the light switches?

   * In recycling, there is an electrical box with a bunch of switches in it. One of them is covered with glow in the dark greenish tape. That's the light switch for recycling.
   * In the storage room, there is an pull string on the back ceiling light.
   * In the imaging area, there's a switch on the pillar in the middle of imaging bench.
   * In the build room, look on the south wall (inside the shelves!)
   * The classroom lights are on the hallway wall near the bathroom.
   * The back room lights are in the classroom to the right of the double doors to the back room.
   * In the entryways (both sides) switches are near to the receiving terminal. These control the store, the offices, the testing room, receiving, and the front desk area.

Pointers

Cash Drawer Accounting

Back to HOWTO Main Page