Facility

From FreekiWiki
Revision as of 14:27, 6 April 2007 by Matteo (talk | contribs) (well clean this up a as we go.)
Jump to navigation Jump to search

Fire Inspection Checklist

General Work Areas

  • Isles must have a clearance of 42 inches across
  • No daisy chaining of electrical power strips
  • hole in walls and ceilings must be patched

Power Panel Locations

  • All power panels must be kept clear and accessable minimum of 48 inches clearance around them.

Fire Exits

  • Fire exits must be lit with a clearly defined lighted exit sign with battery backup. These units are powered from house power and should stay on at all times.

Fire extinguishers

  • These must be checked annually. The tags must reflect an inspection has been performed in the calendar year.

Maintainance Logs

Fire Extinguishers

Vendor
United Fire & Safety
xxxxx N MLK Blvd.
Portland, OR 972xx
FE Log
Inspection tags good for one year.
Location Type Inspection Date
Lab ABC December 2004
Kitchen ABC December 2004
Build ABC December 2004
Printerland ABC December 2004
Evaluation ABC December 2004
Recycling ABC December 2004

HVAC

UNIT INFO

units listed from north to south

UNIT ONE [Warehouse]
Located in the Warehouse, next to the door from Advanced Testing.
Thermostat is manual, on west side of a pillar, near the front, obscured by shelving.
Day & Night Co. Model 394GAW060175
Gas Unit with no Air Conditioning. Gas line runs through Black Hole, then along back wall through Eval, Build,
Back Stage, and out near rollup door. Facing meters, it is the one on the right.
Gas valves are located at the unit and at the meter.
Electrical switch is at the unit. Electical is fed from ?
UNIT TWO [Receiving]
Located in the attic space above Receiving, with air conditioning condenser on roof.
Thermostat is programable, on west wall of Receiving.
Electric Furnace, fed from?
Currently disabled, pending attic area remodel. ( noted 10/15/06)
UNIT THREE [Evaluation]
Located on ceiling above Eval.
Electric furnace, fed from panel on north wall of eval.
Day & Night Model 394GAW060175
Air conditioning ?
Thermostat Programable, located on East wall of Eval II.
UNIT FOUR [Store]
Located above bathroom in Admin/Lab area.
Gas? Has air conditioning.
Thermostat programable, located on north wall of Thrift Store.
UNIT FIVE [Admin/Lab]
On roof above Lab.
Serves all of space from Reception to Build.
Gas unit with air conditioning.
Gas runs accross roof, shut offs at unit and meter.
Meter at south rollup door, is second to left,facing meters, same meter feeds other units. (will document which units later).
Thermostat is programable, located on south wall of Lab.
UNIT SIX [Classroom]
On roof above Store
Gas unit with air conditioning
Gas shut off's at roof unit, and at south rollup door,meter second to left, facing meters, shared by other units (to be documented later).
Thermostat programable, located on north wall of the classroom near the door to Lab.

check drain above store

UNIT SEVEN [Meeting Room]
Located in Art Studio above Meeting Room.
Electric? with air conditioning. Condenser located on roof? (need art stuff moved to access unit to clarify)
Thermostat manual, located on west wall in Library, next to Meeting Room door.

THERMOSTATS

Locations listed in Unit Info above.
Batteries in programable thermostats should be changed annually
Month ?
Two AA batteries each?

FILTERS

Vendors
Honke Heating, Gresham, 503-666-3725
Fred Meyer
True Value Hardware
Filter Log
Filters should be changed 2 times per year.
HEPA Filter?
Location Size Date
Unit One: Warehouse 28X30 missing
Unit Two: Receiving ??x?? disabled
Unit Three: Eval 12X21 need to replace
Unit Four: Store ??x?? June 2004
Unit Five: Admin/Lab ??x?? ???
Unit Six: Classroom ??x?? ???
Unit Seven: Meeting Room ??x?? ???