Prebuild Instructor Checklist
Jump to navigation
Jump to search
General Stuff
- Introduce yourself and let the volunteers know when you are ending your shift (introduce them to the next person, if possible)
- Always keep in mind that most students are here to get through prebuild so they can move on to build.
- Follow what each volunteer is doing to make sure he/she is doing it right
- Ask frequent questions like "Where are you on the chart?"
- Make sure the volunteers understand how to test out
- Make sure that volunteers are familiar with the goals of each section
- Remind volunteers to take the Command Line class and that it's a necessary step before starting Build
- Encourage people to teach each other. When testing folks out of one step, usually do this by observing the student showing a newbie how to do the job.
- (Occasionally, there will be students that have learned the job satisfactorily but will not be able to teach someone -- e.g. they don't speak English well enough.)
Opening Shift
- Set up Card Sorting
- Clear off work space
- Get new cards to sort from Receiving and Eval
- Take overflowing boxes (that have been sorted) to their appropriate places
- Post-it notes and pens for labeling piles
- Example RAM and motherboards
- Meta Triage - make sure systems are stacked in a safe manner and there are enough incoming systems for each area
- Check the cart
- Does it need to be sent to the warehouse?
- Are there parts that haven't been removed
- See if any of the card sorters can be tested out right away
- Does anyone else want to test out?
- Check tools
- Phillips and regular screwdrivers for Eval 1 and 2
- Power supply tester for Eval 2
Middle Shift
- Restack systems to be the safest
- Move hard drives into advanced testing for lockup
- Tools (in the future this may be like recycling setup)
- Take card boxes from Eval 1 & 2 to Card Sorting
- If there's time, do some advanced card sorting
- Coordinate with production when you see a need to change the flowcharts
- Replace flowcharts if necessary
- Check the cart
- Does it need to be sent to the warehouse?
- Are there parts that haven't been removed?
- Try to send the cart over before the morning shift leaves, even if it's not full. (This prevents the afternoon folks from having to correct the morning folks' mistakes.)
- Does anyone want to test out?
- Are there incoming folks that they can show the ropes? Hook 'em up!
- Empty the trash & recycling bins
Closing Shift
- Make sure systems are stacked in a safe manner and in the correct spaces
- Make sure all hard drives have made it to advanced testing for lockup
- Turn off hardware in Eval 2
- Turn off stereo
- Check tools
- Move memory into Advanced Testing
- Check the cart
- Does it need to be sent to the warehouse?
- Are there parts that haven't been removed
- Does anyone want to test out?
- Remove all debris from recycled systems (stick it in recycled systems on cart, if possible)
- Make sure Card Sorting and Eval are clean and ready for the next day