New Prebuild Instructor Training Checklist
Revision as of 15:11, 29 April 2011 by Elizabethwt (talk | contribs)
| New Prebuild Instructor Training | Date | New Instructor Initials | Old Instructor Initials |
|---|---|---|---|
| Sign Intern Contract | |||
| Explain what to do if you are sick or need to change your schedule | |||
| Take Hardware ID Class | |||
| Shadow Hardware ID Instructor | |||
| Teach Hardware ID Class | |||
| Check out System Evaluation Overview Chart | |||
| Do System Evaluation Shift | |||
| Teach A System Evaluation Shift (test out) | |||
| Hard Drive Triage | |||
| Power Supply Triage | |||
| Optical Drive Triage | |||
| Learn how to check systems on the cart and how to take it back to the warehouse |