Difference between revisions of "Design and Construction"
Jump to navigation
Jump to search
Halfasspete (talk | contribs) |
|||
Line 1: | Line 1: | ||
+ | == Current Projects == | ||
+ | [[Beautification]] - Slappin a fresh coat o' paint on the ole facililty and fixin' all the little things (includes classroom/store divider). | ||
+ | |||
+ | == Proposed Projects == | ||
+ | |||
+ | |||
== Design History == | == Design History == | ||
Revision as of 11:42, 14 January 2006
Current Projects
Beautification - Slappin a fresh coat o' paint on the ole facililty and fixin' all the little things (includes classroom/store divider).
Proposed Projects
Design History
- PHASE ONE
- 5,000 SF
- Plan
- Description
- PHASE TWO
- 10,000 SF
- Plan
- Description
- PHASE TWO REVISED
- 15,000 SF + 1,500 SF sublet
- Plan
- Description
- PHASE THREE PROPOSAL
- 15,000 SF + 1,500 SF sublet
- Plan
- Description