Difference between revisions of "Facility"
Jump to navigation
Jump to search
(→upstairs remodel: section removed) |
|||
Line 166: | Line 166: | ||
</table> | </table> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
[[Category:Action]] | [[Category:Action]] |
Revision as of 11:36, 26 March 2007
Fire Inspection Checklist
General Work Areas
- Isles must have a clearance of 42 inches across
- No daisy chaining of electrical power strips
- hole in walls and ceilings must be patched
Power Panel Locations
- All power panels must be kept clear and accessable minimum of 48 inches clearance around them.
Fire Exits
- Fire exits must be lit with a clearly defined lighted exit sign with battery backup. These units are powered from house power and should stay on at all times.
Fire extinguishers
- These must be checked annually. The tags must reflect an inspection has been performed in the calendar year.
Maintainance Logs
Fire Extinguishers
- Vendor
- United Fire & Safety
- xxxxx N MLK Blvd.
- Portland, OR 972xx
- FE Log
- Inspection tags good for one year.
Location | Type | Inspection Date |
Lab | ABC | December 2004 |
Kitchen | ABC | December 2004 |
Build | ABC | December 2004 |
Printerland | ABC | December 2004 |
Evaluation | ABC | December 2004 |
Recycling | ABC | December 2004 |
HVAC
UNIT INFO
- [units listed from north to south]
UNIT ONE [Warehouse]
- Located in the Warehouse, next to the door from Advanced Testing.
- Thermostat is manual, on west side of a pillar, near the front, obscured by shelving.
- Day & Night Co. Model 394GAW060175
- Gas Unit with no Air Conditioning. Gas line runs through Black Hole, then along back wall through Eval, Build, :Back Stage, and out near rollup door. Facing meters, it is the one on the right.
- Gas valves are located at the unit and at the meter.
- Electrical switch is at the unit. Electical is fed from ?
UNIT TWO [Receiving]
- Located in the attic space above Receiving, with air conditioning condenser on roof.
- Thermostat is programable, on west wall of Receiving.
- Electric Furnace, fed from?
- Currently disabled, pending attic area remodel. ( noted 10/15/06)
UNIT THREE [Evaluation]
- Located on ceiling above Eval.
- Electric furnace, fed from panel on north wall of eval.
- Air conditioning ?
- Thermostat Programable, located on East wall of Eval II.
UNIT FOUR [Store]
- Located above bathroom in Admin/Lab area.
- Gas? Has air conditioning.
- Thermostat programable, located on north wall of Thrift Store.
UNIT FIVE [Admin/Lab]
- On roof above Lab.
- Serves all of space from Reception to Build.
- Gas unit with air conditioning.
- Gas runs accross roof, shut offs at unit and meter.
- Meter at south rollup door, is second to left,facing meters, same meter feeds other units. (will document which units later).
- Thermostat is programable, located on south wall of Lab.
UNIT SIX [Classroom]
- On roof above Store
- Gas unit with air conditioning
- Gas shut off's at roof unit, and at south rollup door,meter second to left, facing meters, shared by other units (to be documented later).
- Thermostat programable, located on north wall of the classroom near the door to Lab.
UNIT SEVEN [Meeting Room]
- Located in Art Studio above Meeting Room.
- Electric? with air conditioning. Condenser located on roof? (need art stuff moved to access unit to clarify)
- Thermostat manual, located on west wall in Library, next to Meeting Room door.
THERMOSTATS
- Locations listed in Unit Info above.
- Batteries in programable thermostats should be changed annually
- Month ?
- Two AA batteries each?
FILTERS
- Vendors
- Honke Heating, Gresham, 503-666-3725
- Fred Meyer
- True Value Hardware
- Filter Log
- Filters should be changed 2 times per year.
Location | Size | Date |
Unit One: Warehouse | ??x?? | ??? |
Unit Two: Receiving | ??x?? | ??? |
Unit Three: Eval | ??x?? | ??? |
Unit Four: Store | ??x?? | June 2004 |
Unit Five: Admin/Lab | ??x?? | ??? |
Unit Six: Classroom | ??x?? | ??? |
Unit Seven: Meeting Room | ??x?? | ??? |