Maintainance Logs

Fire Extinguishers

Vendor
United Fire & Safety
xxxxx N MLK Blvd.
Portland, OR 972xx
FE Log
Inspection tags good for one year.
Location Type Inspection Date
Lab ABC December 2004
Kitchen ABC December 2004
Build ABC December 2004
Printerland ABC December 2004
Evaluation ABC December 2004
Recycling ABC December 2004

HVAC

UNIT INFO

[units listed from north to south]
UNIT ONE [Warehouse]
Located in the Warehouse, next to the door from Advanced Testing.
Thermostat is manual, on west side of a pillar, near the front, obscured by shelving.
Day & Night Co. Model 394GAW060175
Gas Unit with no Air Conditioning. Gas line runs through Black Hole, then along back wall through Eval, Build, :Back Stage, and out near rollup door. Facing meters, it is the one on the right.
Gas valves are located at the unit and at the meter.
Electrical switch is at the unit. Electical is fed from ?
UNIT TWO [Receiving]
Located in the attic space above Receiving, with air conditioning condenser on roof.
Thermostat is programable, on west wall of Receiving.
Electric Furnace, fed from?
Currently disabled, pending attic area remodel. ( noted 10/15/06)

FILTERS

Vendors
Honke Heating, Gresham, 503-666-3725
Fred Meyer
True Value Hardware
Filter Log
Filters should be changed 2 times per year.
Location Size Date
Unit One: Warehouse ??x?? ???
Unit Two: Receiving ??x?? ???
Unit Three: Eval ??x?? ???
Unit Four: Admin ??x?? June 2004
Unit Five: Store ??x?? ???
Unit Six: Classroom ??x?? ???
Unit Seven: Meeting Room ??x?? ???

upstairs remodel

Purpose

The purpose of the remodel is to finish the floor in old printerland.

The project is funded by a personal grant for the classic gaming library.


Scope of work to be done

We are going to add floor Joists to strengthen the structure of the floor and add flooring to the rest of the space. The work will be done to code specifications. The furnace will be relocated and duct work rerouted as needed.


To do Tasks

  • clear all equipment from work area
    • store in big classroom
  • roll up insulation and bag for reinstallation
    • Store in big classroom
  • reroute electrical
  • uninstall furnace
  • remove existing blocking
  • add new joists and shore up beams
    • allow for Cable infrastructure (cable trays and trap door access)
      • Cable for Network
  • blocking reinstalled where needed
  • HVAC ducting in floor
  • Sheet floor
  • vented Closet for Heating
  • Add walls
    • at least one wall to contain the CGL
  • Move equipment from platform (museum)
  • remove floor 1x12 existing
  • sheet floor