Difference between revisions of "Hardware Testing Instructor Responsibilities"

From FreekiWiki
Jump to navigation Jump to search
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
{{migrated}}
 +
[https://docs.google.com/document/d/1vPIrhXGn5HiVXNz3EidFLmGMwYpOECfBY4D2O1yzjAk/edit?usp=sharing Link]
 +
 
'''Always Remember: Supporting Hardware Testing volunteers is our number one priority as staff instructors!''' This means:
 
'''Always Remember: Supporting Hardware Testing volunteers is our number one priority as staff instructors!''' This means:
 
* Welcoming incoming volunteers at the beginning of the shift
 
* Welcoming incoming volunteers at the beginning of the shift
Line 11: Line 14:
 
* Providing volunteers opportunities to work on special projects, as is needed and appropriate
 
* Providing volunteers opportunities to work on special projects, as is needed and appropriate
 
* Be sure to thank volunteers for their work as they leave
 
* Be sure to thank volunteers for their work as they leave
<br>
 
<br>
 
<br>
 
<br>
 
 
<br>
 
<br>
 
== Oversight Checklist ==
 
== Oversight Checklist ==
Line 22: Line 21:
 
* Prioritize tasks based on current stock, Store and Build needs - '''and update the white board'''
 
* Prioritize tasks based on current stock, Store and Build needs - '''and update the white board'''
 
* Welcome volunteers and direct them to prioritized tasks
 
* Welcome volunteers and direct them to prioritized tasks
* Hard Drives - swap tested drives, load drives to be wiped
+
* Monitors need to be set up or taken down at the beginning of every shift
 
* Remember to delegate! But if no volunteers are available:  
 
* Remember to delegate! But if no volunteers are available:  
 
** Swap RAM
 
** Swap RAM
Line 31: Line 30:
 
=== During Shift ===
 
=== During Shift ===
 
* Be available to answer volunteers' questions and to support their endeavors
 
* Be available to answer volunteers' questions and to support their endeavors
* Hard drive testing:
+
* Power adapter should be sorted and taken to the different areas necessary - laptops, am land, store, av
** Pull and label all tested hard drives.  Recycle the failed ones.
+
** Pull all RAM from receiving and the system evaluation area to be sorted and tested
** Stock all the machines. Your goal is to keep TARDIS as free of unwiped hard drives as much as you can.
+
** Stock the Build room with RAM, cards, load hard drives, sort also pull items into appropriate boxes
 
** Repair failed machines as necessary
 
** Repair failed machines as necessary
 
** REPORT PROBLEMS WITH MACHINES WHEN THEY HAPPEN (either to those with the know-how to fix 'em or in RT)
 
** REPORT PROBLEMS WITH MACHINES WHEN THEY HAPPEN (either to those with the know-how to fix 'em or in RT)
** '''Remember to never leave unwiped drives unattended anywhere in Hardware Testing'''
+
** Sort incoming shelf in hardware test area for interns to test according to the needs of the different departments
 +
**Check on the flow of work source materials to the different departments
  
 
=== End of Shift ===  
 
=== End of Shift ===  
 
* Make sure volunteers clean up their areas and that the area is neat and organized for the next shift
 
* Make sure volunteers clean up their areas and that the area is neat and organized for the next shift
 
** This includes emptying all yellow recycling bins - '''make sure all volunteers are familiar with this process!'''
 
** This includes emptying all yellow recycling bins - '''make sure all volunteers are familiar with this process!'''
** This also includes taking destroyed hard drives to Recycling when the bin is full or close to full
+
***Report any problems with tools, machinery to appropriate staff  -create a RT ticket for any needed items
* Make sure that all wiped hard drives are brought to TARDIS and sorted according to size (empty green bin!)
+
<br>
.
+
<br>
 +
<br>
 +
<br>
 +
<br>
  
 
=== End of Day ===
 
=== End of Day ===
Line 61: Line 64:
 
== Hardware Testing Tasks ==
 
== Hardware Testing Tasks ==
 
* Power Supply Sorting
 
* Power Supply Sorting
* Card Sorting
+
* Card sorting &testing
* Hard Drive Testing - Instructor Only
 
 
* External Hard Drive Enclosure Testing
 
* External Hard Drive Enclosure Testing
 
* External Optical Drive Testing
 
* External Optical Drive Testing
Line 73: Line 75:
 
* Wireless Cards - PCI and laptop PC Bus
 
* Wireless Cards - PCI and laptop PC Bus
 
* Empty Recycling Bins
 
* Empty Recycling Bins
 +
* Monitor, TV, Projector test
  
 
[[Category:Production]]
 
[[Category:Production]]
 
[[Category:Hardware Testing]]
 
[[Category:Hardware Testing]]
 
[[Category:Training]]
 
[[Category:Training]]

Latest revision as of 12:48, 1 August 2014

deletion

This page has been migrated to a document on Free Geek's Google Drive.

Information remaining behind may no longer be relevant.

MIGRATOR:

When you have tagged this page as migrated,
please add a link to the new document on Google Drive.

(Link to new page immediately below.)


Link

Always Remember: Supporting Hardware Testing volunteers is our number one priority as staff instructors! This means:

  • Welcoming incoming volunteers at the beginning of the shift
  • Introducing yourself to volunteers you haven't met before, or whose names you don't remember
  • Giving volunteers choices about the kind of work they want to do that day, based on HT's needs, when possible
    • Appropriately engage each volunteer in an appropriate task, trying to get all tasks covered
    • Which volunteers are present during your shift? What are their strengths and weaknesses? Do they want to learn something new? Match up their interests with priority tasks
  • Teaching volunteers how to test different kinds of gizmos, based on their interest, or facilitating another volunteer to teach them (as appropriate)
  • Making them aware of their resources, *especially* our documentation, but also Google, the FG wiki, other volunteers, and you!
  • Being available for any questions that they may have
  • Remaining patient and friendly while maintaining good boundaries
  • Providing volunteers opportunities to work on special projects, as is needed and appropriate
  • Be sure to thank volunteers for their work as they leave


Oversight Checklist

Beginning of Shift

  • Check meetingwords.com/whiteboard
  • Prioritize tasks based on current stock, Store and Build needs - and update the white board
  • Welcome volunteers and direct them to prioritized tasks
  • Monitors need to be set up or taken down at the beginning of every shift
  • Remember to delegate! But if no volunteers are available:
    • Swap RAM
    • Sort Incoming
    • Sort boxes of power supplies that come from Receiving, routing them to other areas
    • Sort small Hard Drive Lock Box into big Hard Drive Lock Box

During Shift

  • Be available to answer volunteers' questions and to support their endeavors
  • Power adapter should be sorted and taken to the different areas necessary - laptops, am land, store, av
    • Pull all RAM from receiving and the system evaluation area to be sorted and tested
    • Stock the Build room with RAM, cards, load hard drives, sort also pull items into appropriate boxes
    • Repair failed machines as necessary
    • REPORT PROBLEMS WITH MACHINES WHEN THEY HAPPEN (either to those with the know-how to fix 'em or in RT)
    • Sort incoming shelf in hardware test area for interns to test according to the needs of the different departments
    • Check on the flow of work source materials to the different departments

End of Shift

  • Make sure volunteers clean up their areas and that the area is neat and organized for the next shift
    • This includes emptying all yellow recycling bins - make sure all volunteers are familiar with this process!
      • Report any problems with tools, machinery to appropriate staff -create a RT ticket for any needed items






End of Day

  • Lock up all hard drives - remember to check Store Returns bin & Incoming shelves
  • Put away testing equipment
  • Set up hard drives to test over night, but not on the weekend/holidays
  • Load RAM to be started the next morning (unless a volunteer did it)
  • Turn off all unused computers and LCD monitors
  • Empty small Lock Box into big Lock Box and make sure it is locked
  • Make sure TARDIS is locked - BOTH LOCKS

.

End of Week

  • Shutdown any hard drives that are still running & return them to the big Lock Box
  • Turn off the TARDIS's ceiling fan

Hardware Testing Tasks

  • Power Supply Sorting
  • Card sorting &testing
  • External Hard Drive Enclosure Testing
  • External Optical Drive Testing
  • RAM Testing
  • Motherboard Testing
  • Processor Testing
  • Video Card Testing
  • Network Testing
  • Wireless Keyboard & Mice Testing
  • Wireless Cards - PCI and laptop PC Bus
  • Empty Recycling Bins
  • Monitor, TV, Projector test