Difference between revisions of "Meta Question"

From FreekiWiki
Jump to navigation Jump to search
Line 35: Line 35:
  
 
==Regular collective==
 
==Regular collective==
Four to ten people that met on a weekly basis. We hired a Sales Coordinator to expand and add consistency to the store in specific and sales in general. We hired a Reception Coordinator. Quality control was added to the build program which was run by a temporary contractor and then by two Build Co-coordinators. The council was formed during this stage to coordinate between several working groups and deal with "big picture" and controversial issues. The adoption program waiting list was still growing more often than shrinking. Production was improving. Recycling was rather chaotic but slowly gaining efficiency.
+
Four to ten people that met on a weekly basis. We hired a Reception Coordinator. The council was formed during this stage to coordinate between several working groups and deal with "big picture" and controversial issues.  
* Adoption --  
+
* Adoption -- The adoption program waiting list was still growing more often than shrinking.  
* Build --
+
* Build -- Quality control was added to the build program which was run by a temporary contractor and then by two Build Co-coordinators. Production was improving.
* Coding --  
+
* Coding -- Work on the second distro began and we began re-implementing the database in PHP.
* Education --  
+
* Education -- Besides adoption classes we experimented with classes in programming languages and found that they ran better if we tied them into specific volunteer work.
* Recycling --  
+
* Recycling -- Recycling was rather chaotic but slowly gaining efficiency.
* Sales --  
+
* Sales -- We hired a Sales Coordinator to expand and add consistency to the store in specific and sales in general.
  
 
==Larger collective==
 
==Larger collective==

Revision as of 10:46, 8 January 2005

What is the meta question?

How big should Free Geek get?

That's it?

In a nutshell, yes. But we are now large enough to think about it a bit more than in the past. In the past, we've grown in response to more demand coming in (e.g. people signing up for free computers) or because we finally reached a level where we were able to do something we'd wanted to do all along (e.g. finally starting to grant hardware out to nonprofits). All along there was very little planning. More often than not, we were reacting to crises and Free Geek grew however it had to in order to solve the problems at hand.

Where does this come from?

Over the years, we've mostly done stuff because we had to, reacting to emergency situations as they came up and forming our policy out of necessity. We think it's time to think ahead and starting deciding where we want to go.

Free Geek has evolved through several stages. Each stage operated in its own way, but failed to work well at a certain point due to an increase in the size of the organization. Each new stage grew out this growth, often because we had no choice.

We'd rather think a little about the future and consciously decide how and how big Free Geek should grow.

So what are those stages we've evolved through?

There are many ways we could define these stages. From a staff perspective, we could identify several:

One staff person

We didn't know if we were a viable organization and were trying to see if we could could become somewhat viable before our seed money ran out. The ASS group and the education group formed. During this stage, the public "discovered" us and as a result the adoption program overfilled. We had to set up a waiting list in order to manage the volunteer schedule. As the waiting list grew longer, it became impossible to manage all the volunteers with just one (or even two) paid staff members, so we expanded.

  • Adoption -- The adoption program was formed. There was no standard FreekBox, however and we learned that we needed to standardize this.
  • Build -- There was no build program. The ASSes did it.
  • Coding -- There was no coding program. The ASSes did it. The initial database was developed. The initial distro was begun.
  • Education -- The education group developed the first adoption classes and manual
  • Recycling -- Basically we hucked dead computers into boxes and sent them elsewhere.
  • Sales -- There were no sales.

Informal collective

We had three members and few formal staff meetings. We decided things by word of mouth. There were a few people outside the collective being paid by outside agencies. We received a financial setback when we didn't receive an expected grant. Thus we were forced to expand at about the same time we needed to raise more money.

  • Adoption -- The waiting list for the adoption program was still growing.
  • Build -- The build program was formed during this stage when it became clear that we couldn't rely on perpetual unorganized volunteer energy to build computers.
  • Coding -- The initial distro was developed
  • Education -- Running the adoption program and getting feedback were the main work of the Education group.
  • Recycling -- We learned that by breaking down computers into component materials we could make a more money, but recycling was a pretty inefficient and chaotic place.
  • Sales -- Financial setbacks forced us to open a store, which at first was run by volunteers and staff members. It was only being watched when customers wanted to buy something.

Regular collective

Four to ten people that met on a weekly basis. We hired a Reception Coordinator. The council was formed during this stage to coordinate between several working groups and deal with "big picture" and controversial issues.

  • Adoption -- The adoption program waiting list was still growing more often than shrinking.
  • Build -- Quality control was added to the build program which was run by a temporary contractor and then by two Build Co-coordinators. Production was improving.
  • Coding -- Work on the second distro began and we began re-implementing the database in PHP.
  • Education -- Besides adoption classes we experimented with classes in programming languages and found that they ran better if we tied them into specific volunteer work.
  • Recycling -- Recycling was rather chaotic but slowly gaining efficiency.
  • Sales -- We hired a Sales Coordinator to expand and add consistency to the store in specific and sales in general.

Larger collective

We had a dozen or so people. We were able to hire a Volunteer Coordinator and a Recycling Coordinator. Staff meetings devolved into a laundary list of issues that got delegated to ad hoc committees. At the beginning of this phase those committees often didn't have the time to schedule a meeting. A designated person started putting these meetings onto the schedule. We began to have enough time to devote some energy to more peripheral activities like new Free Geek startups. Paid internships, the Hardware Grants group and Collaborative Technologies started during this stage. The adoption program waiting list was finally starting

  • Adoption --
  • Build --
  • Coding --
  • Education --
  • Recycling --
  • Sales --

Partially decentralized collective

There are 15 collective members and 2 paid interns. We still meet regularly as a whole staff, but also have several standing committees, reducing the need for the overhead involved with setting up an ad hoc committee. We're trying to spend any "spare" energy

  • Adoption --
  • Build --
  • Coding --
  • Education --
  • Recycling --
  • Sales --