Difference between revisions of "Permits"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
Coordinator: Sergio | Coordinator: Sergio | ||
− | Status: Need to get paperwork and submit by 6/22 - | + | Status: Need to get paperwork and submit by 6/22 - DONE, will be submitted 6/19 |
− | + | Paperwork is filled out, and all necessary signatures have been obtained from representatives of abutting properties. Since we do not need an alcohol sales ordinance for Geek Fair, this permit will cost us nothing. | |
== Noise Permit == | == Noise Permit == |
Revision as of 16:15, 14 June 2007
Block Party Permit
Coordinator: Sergio
Status: Need to get paperwork and submit by 6/22 - DONE, will be submitted 6/19
Paperwork is filled out, and all necessary signatures have been obtained from representatives of abutting properties. Since we do not need an alcohol sales ordinance for Geek Fair, this permit will cost us nothing.
Noise Permit
Coordinator: Sergio
Status: Need to pay fee at ONI - week before
Fire Marshall
Coordinator: Sergio
Status: Gotta get it. It'll cost ~$250
OLCC
Coordinator: Ebeth
Status: Turn it in at least 2 weeks before event.