Difference between revisions of "Permits"

From FreekiWiki
Jump to navigation Jump to search
Line 3: Line 3:
 
Coordinator: Sergio
 
Coordinator: Sergio
  
Status: Need to get paperwork and submit by 6/22 - IN PROGRESS
+
Status: Need to get paperwork and submit by 6/22 - DONE, will be submitted 6/19
  
All necessary signatures have been obtained from representatives of abutting properties.  Since we do not need an alcohol sales ordinance for Geek Fair, this permit should cost us nothing.
+
Paperwork is filled out, and all necessary signatures have been obtained from representatives of abutting properties.  Since we do not need an alcohol sales ordinance for Geek Fair, this permit will cost us nothing.
  
 
== Noise Permit ==
 
== Noise Permit ==

Revision as of 16:15, 14 June 2007

Block Party Permit

Coordinator: Sergio

Status: Need to get paperwork and submit by 6/22 - DONE, will be submitted 6/19

Paperwork is filled out, and all necessary signatures have been obtained from representatives of abutting properties. Since we do not need an alcohol sales ordinance for Geek Fair, this permit will cost us nothing.

Noise Permit

Coordinator: Sergio

Status: Need to pay fee at ONI - week before

Fire Marshall

Coordinator: Sergio

Status: Gotta get it. It'll cost ~$250

OLCC

Coordinator: Ebeth

Status: Turn it in at least 2 weeks before event.