Permits

From FreekiWiki
Jump to navigation Jump to search

Block Party Permit

Coordinator: Sergio

Status: Need to get paperwork and submit by 6/22 - SUBMITTED 6/19

Paperwork is filled out, and all necessary signatures have been obtained from representatives of abutting properties. Since we do not need an alcohol sales ordinance for Geek Fair, this permit will cost us nothing.

We need to provide Southeast Uplift with a copy of our certificate of liability insurance before we are issued a street closure permit. A copy was requested from our insurance agency on 6/14 and should hopefully arrive before 6/22.

Noise Permit

Coordinator: Sergio

Status: Need to submit Noise Variance Application (with site plan and distances to residences) and pay $52 fee at ONI at least two weeks before Geek Fair, as it can take up to 10 days for our application's review.

Fire Marshall

Coordinator: Sergio

Status: SUBMITTED 6/19.

Square footage info for fire permit: the area of 10th Ave. we are having closed for Geek Fair is 13500 sq. ft. (60' x 225'), including the sidewalks. The parking lot is 5000 sq. ft. Total outdoor area is 18500 sq. ft. If we estimate the indoor area we'll be using for the event at 5000 sq. ft., this puts us at 23,500 sq. ft., just under the 25,000 sq. ft. limit for the $150 fee.

We should get our lighted exit signs (and possibly some egress maps) put back up in preparation for an inspection, should PF&R choose to do so.

PF&R requires a copy of our street closure permit before they will issue the fire permit.

OLCC

Coordinator: Ebeth

Status: Turn it in at least 2 weeks before event.