As of 11/3/2009, the RAD committee decided to reimpose limits to LCDs and laptops.
 
As of 11/3/2009, the RAD committee decided to reimpose limits to LCDs and laptops.

Latest revision as of 20:19, 11 November 2009

Error creating thumbnail: Unable to save thumbnail to destination

This page has been requested to be deleted.
If you disagree, discuss on the talk page.
Whenever possible, could an Admin please remove this page?

- incorporated into Hardware Grants page, no longer needed as separate page.

What's Going On

As of 11/3/2009, the RAD committee decided to reimpose limits to LCDs and laptops.

If you can demonstrate that your organization needs the following items:
   * Laptops
   * LCD monitors
You can apply for a maximum of 3 of each. If you need more, after 90 days, you may re-apply.
It is necessary to detail why you need laptops as opposed  to PCs and why you need LCD monitors as opposed to CRT monitors.
Please be as specific as possible.
- http://www.freegeek.org/grants/

What we grant out

What we grant out easily

  • PCs
  • Monitors
  • Keyboards
  • Mice
  • Power cords
  • Network cables
  • Printers
  • 20 GB IDE Hard Drives
  • Mousepads
  • Headphones

What is a bit more difficult to grant out

These items need to be hunted for in advanced testing and/or the store. Ask the area coordinator before removing any equipment from its area.

  • Network devices
  • IDE Hard drives with >20 GB
  • Macintosh systems

What there is a waiting list and/or limits for

  • Laptops
    • Laptops can be granted out ONLY if there is a demonstratable need that the organization has no space for a system/LCD combo or that they need to move around with the laptop, e.g. field work
  • LCD-monitors
    • LCD-monitors can be granted out ONLY if there is a demonstratable need that the organization does not have space for CRT-monitors

What we do not grant out

  • Projectors
  • Speakers
  • Long network cables