Difference between revisions of "Keeping and recycling systems"
Jump to navigation
Jump to search
Halfasspete (talk | contribs) |
(postscript files are no longer maintained) |
||
Line 1: | Line 1: | ||
There are triage flow charts that we use to determine whether a computer gets kept or recycled. | There are triage flow charts that we use to determine whether a computer gets kept or recycled. | ||
− | The triage chart for system evaluation 1 looks for obvious reasons for recycling. If one is found the system is recycled. If not, the system goes on to system evaluation 2 for further inspection | + | The [[System Evaluation 1 Triage|triage chart for system evaluation 1]] looks for obvious reasons for recycling. If one is found the system is recycled. If not, the system goes on to system evaluation 2 for further inspection. |
− | The triage chart for system evaluation 2 makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining | + | The [[System Evaluation 2 Triage|triage chart for system evaluation 2]] makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining. |
− | + | To put this in context, there are also wiki versions of the general System Evaluation 1 and 2 overview flow charts: | |
*[[System Evaluation 1 Overview]] | *[[System Evaluation 1 Overview]] | ||
− | |||
*[[System Evaluation 2 Overview]] | *[[System Evaluation 2 Overview]] | ||
− | |||
[[Category:Prebuild]] | [[Category:Prebuild]] |
Revision as of 10:52, 1 January 2006
There are triage flow charts that we use to determine whether a computer gets kept or recycled.
The triage chart for system evaluation 1 looks for obvious reasons for recycling. If one is found the system is recycled. If not, the system goes on to system evaluation 2 for further inspection.
The triage chart for system evaluation 2 makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining.
To put this in context, there are also wiki versions of the general System Evaluation 1 and 2 overview flow charts: