Difference between revisions of "Keeping and recycling systems"
Jump to navigation
Jump to search
(postscript files are no longer maintained) |
|||
Line 10: | Line 10: | ||
− | [[Category:Prebuild]] | + | [[Category:Old Prebuild]] |
Latest revision as of 15:46, 14 March 2009
There are triage flow charts that we use to determine whether a computer gets kept or recycled.
The triage chart for system evaluation 1 looks for obvious reasons for recycling. If one is found the system is recycled. If not, the system goes on to system evaluation 2 for further inspection.
The triage chart for system evaluation 2 makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining.
To put this in context, there are also wiki versions of the general System Evaluation 1 and 2 overview flow charts: