Difference between revisions of "Keeping and recycling systems"
Jump to navigation
Jump to search
| (4 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
| − | [[Category:Prebuild]] | + | There are triage flow charts that we use to determine whether a computer gets kept or recycled. |
| + | |||
| + | The [[System Evaluation 1 Triage|triage chart for system evaluation 1]] looks for obvious reasons for recycling. If one is found the system is recycled. If not, the system goes on to system evaluation 2 for further inspection. | ||
| + | |||
| + | The [[System Evaluation 2 Triage|triage chart for system evaluation 2]] makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining. | ||
| + | |||
| + | To put this in context, there are also wiki versions of the general System Evaluation 1 and 2 overview flow charts: | ||
| + | *[[System Evaluation 1 Overview]] | ||
| + | *[[System Evaluation 2 Overview]] | ||
| + | |||
| + | |||
| + | [[Category:Old Prebuild]] | ||
Latest revision as of 14:46, 14 March 2009
There are triage flow charts that we use to determine whether a computer gets kept or recycled.
The triage chart for system evaluation 1 looks for obvious reasons for recycling. If one is found the system is recycled. If not, the system goes on to system evaluation 2 for further inspection.
The triage chart for system evaluation 2 makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining.
To put this in context, there are also wiki versions of the general System Evaluation 1 and 2 overview flow charts: