Difference between revisions of "The Status of Hardware Grants"

From FreekiWiki
Jump to navigation Jump to search
Line 32: Line 32:
 
===What there is a waiting list and/or limits for===
 
===What there is a waiting list and/or limits for===
 
* Laptops
 
* Laptops
 +
** Laptops can be granted out ONLY if there is a demonstratable need that the organization has no space for a system/LCD combo or that they need to move around with the laptop, e.g. field work
 
* LCD-monitors
 
* LCD-monitors
* Projectors
+
** LCD-monitors can be granted out ONLY if there is a demonstratable need that the organization does not have space for CRT-monitors
  
 
===What we do not grant out===
 
===What we do not grant out===

Revision as of 12:28, 5 November 2009

What's Going On

As of 11/3/2009, the RAD committee decided to reimpose limits to LCDs and laptops.

If you can demonstrate that your organization needs the following items:
   * Laptops
   * LCD monitors
You can apply for a maximum of 3 of each. If you need more, after 90 days, you may re-apply.
It is necessary to detail why you need laptops as opposed  to PCs and why you need LCD monitors as opposed to CRT monitors.
Please be as specific as possible.
- http://www.freegeek.org/grants/

What we grant out

What we grant out easily

  • PCs
  • Monitors
  • Keyboards
  • Mice
  • Power cords
  • Network cables
  • Printers
  • 20 GB IDE Hard Drives
  • Mousepads
  • Headphones

What is a bit more difficult to grant out

These items need to be hunted for in advanced testing and/or the store. Ask the area coordinator before removing any equipment from its area.

  • Network devices
  • IDE Hard drives with >20 GB
  • Macintosh systems

What there is a waiting list and/or limits for

  • Laptops
    • Laptops can be granted out ONLY if there is a demonstratable need that the organization has no space for a system/LCD combo or that they need to move around with the laptop, e.g. field work
  • LCD-monitors
    • LCD-monitors can be granted out ONLY if there is a demonstratable need that the organization does not have space for CRT-monitors

What we do not grant out

  • Projectors
  • Speakers
  • Long network cables