Difference between revisions of "Keeping and recycling systems"

From FreekiWiki
Jump to navigation Jump to search
(no pdf versions)
Line 4: Line 4:
  
 
The triage chart for system evaluation 2 makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining. A postscript version of this flow chart can be found at http://web.freegeek.org/howto/deadtrees/triage-2.ps .
 
The triage chart for system evaluation 2 makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining. A postscript version of this flow chart can be found at http://web.freegeek.org/howto/deadtrees/triage-2.ps .
 +
 +
There are also wiki versions of these flow charts, and of the general Eval 1 and Eval 2 flow charts:
 +
*[[System Evaluation 1 Overview]]
 +
*[[System Evaluation 1 Triage]]
 +
*[[System Evaluation 2 Overview]]
 +
*[[System Evaluation 2 Triage]]
 +
  
 
[[Category:Prebuild]]
 
[[Category:Prebuild]]

Revision as of 18:53, 31 December 2005

There are triage flow charts that we use to determine whether a computer gets kept or recycled.

The triage chart for system evaluation 1 looks for obvious reasons for recycling. If one is found the system is recycled. If not, the system goes on to system evaluation 2 for further inspection. A postscript version of this flow chart can be found at http://web.freegeek.org/howto/deadtrees/triage-1.ps .

The triage chart for system evaluation 2 makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining. A postscript version of this flow chart can be found at http://web.freegeek.org/howto/deadtrees/triage-2.ps .

There are also wiki versions of these flow charts, and of the general Eval 1 and Eval 2 flow charts: