Difference between revisions of "Server Evaluation Triage"

From FreekiWiki
Jump to navigation Jump to search
Line 8: Line 8:
 
     notyet [label="Consult your Build Instructor", shape="box", style="bold"]
 
     notyet [label="Consult your Build Instructor", shape="box", style="bold"]
 
     no [label="NO!\nWe do not want it for a server.\nCheck with Instructor on further processing.", shape="box", style="bold"]
 
     no [label="NO!\nWe do not want it for a server.\nCheck with Instructor on further processing.", shape="box", style="bold"]
     yes [label="PXE Boot the server to the Hardware Detection Tool,\nand have the Instructor look it over\nbefore beginning the Build process", shape="box", style="bold"]
+
     yes [label="PXE Boot the server to the\nHardware Detection Tool and have\nthe Instructor look it over before\nbeginning the Build process", shape="box", style="bold"]
  
 
     HoldTag [label="Does the system have a Hold For Tag?"]
 
     HoldTag [label="Does the system have a Hold For Tag?"]

Revision as of 13:36, 23 March 2011

This is a graph with borders and nodes. Maybe there is an Imagemap used so the nodes may be linking to some Pages.

Boot Without Keyboard
Just make sure it attempts to boot; no need to install a hard drive during Eval.
Auto-Reboot After Power-Loss
Will the system reboot all by itself after a power-loss when the system was running before the power-loss (required)? Will the system stay off after a power-loss when the system was not running before the power-loss (optional)?