Build Instructor Guide

From FreekiWiki
Revision as of 14:15, 29 December 2009 by Caitlin (talk | contribs) (→‎Before the shift begins:: some minor procedural adjustments)
Jump to navigation Jump to search

Buildteacher duties

Before the shift begins:

    • Check the signup sheet at the front desk to see who's expected and note how many slots are open. There are usually walk-ins and you should have some idea of how many stations are available.
    • Check the whiteboard for today's special instructions. Also check in with the staff Production Coordinator for any updates.
    • Make sure supplies are available:
      1. RAM: Replenish supplies from the Tardis.
      2. Hard drives: See what size hard drives will be needed for the build shift and get the appropriately sized wiped drives from the Tardis. Do imaging throughout the session as you get a chance, mark imaged drives with a red marker dot, place in the hard drive box for builders.

During the shift:

    • Greet people as they arrive, get their name, introduce yourself as their instructor and identify the build assistants.
      1. If a person is new to build, make sure they have already gone through pre-build. If not, direct them to the prebuild instructor.
      2. Persons starting their first QC should have their own personal record sheet available in the bulid room. If their shett isn't there, it may still be in prebuild. If at all possible, start the first QC with a very ordinary box that is unlikely to have interesting problems. We don't want total puzzlement to be the student's first experience with build.
      3. Persons who have finished their QC's and are starting their first build need to be shown where to find boxes in the warehouse and what to look for in the boxes: no missing case parts, CPU size, FG-PDX, etc. Please have them record the BIOS entry key on the build sheet so that the beginning QC'er can find it, and record hardware details as build progresses for when support is needed in the future.
      4. During the session, keep an eye out for people, especially new ones, who look lost or troubled. Help gently. Try too, to make sure that people are going through the process (checklist and instructions on the sheets in the plastic protector envelopes) and not just drylabbing.
      5. Make sure to show buliders how to problem solve instead of just fixing things for them.
      6. Let builders know if you are leaving momentarily and always encourage them to turn to their neighbors for help.
      7. Remember that computer knowledge does not equal intelligence. Treat everyone with respect and realize that builders will have different learning styles.
      8. Moniters should be tested throughout your build shift if you have the time.

At the end of the shift:

    • Start cleaning up for the next shift, perhaps 15 minutes in advance. This is especially important at the end of the morning session if there are no empty stations for any early arrivals for the afternoon shift, to minimize the chaos of two flows of builders moving in contrary directions. It's also important at the end of the afternoon shift to get the builders out on time so the staff can go home too. Always announce when ther is 15 minutes left in a build shift.

Howto Checkout QCed Boxen

  • Make sure all of the slots and bays are covered and that the cards and slot covers are not loose
  • Check the box over carefully both for specs and cosmetics. Make sure that any Microsoft certification stickers and their glue gunk are removed.
  • Check if it rattles when you shake it
  • If you haven't seen it boot up fine, reboot it (some people see that it says press F2 to continue, so they do it with out ever fixing it)
    • tip - Unplug all power to the box before doing that reboot to see if it retains BIOS settings. -- MW 14:40, 27 March 2008 (PDT)

Remember to use your resources if you get stuck. There are always staff Production Coordinators assigned to every shift that you can go to for help.