Difference between revisions of "Keeping and recycling systems"

From FreekiWiki
Jump to navigation Jump to search
 
(3 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
There are triage flow charts that we use to determine whether a computer gets kept or recycled.  
 
There are triage flow charts that we use to determine whether a computer gets kept or recycled.  
  
The triage chart for system evaluation 1 looks for obvious reasons for recycling. If one is found the system is recycled. If not, the system goes on to system evaluation 2 for further inspection. A postscript version of this flow chart can be found at http://web.freegeek.org/howto/deadtrees/triage-1.ps and there is also a
+
The [[System Evaluation 1 Triage|triage chart for system evaluation 1]] looks for obvious reasons for recycling. If one is found the system is recycled. If not, the system goes on to system evaluation 2 for further inspection.  
[http://web.freegeek.org/howto/deadtrees/triage-1.pdf pdf version].
 
  
The triage chart for system evaluation 2 makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining. A postscript version of this flow chart can be found at http://web.freegeek.org/howto/deadtrees/triage-2.ps and there is also a
+
The [[System Evaluation 2 Triage|triage chart for system evaluation 2]] makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining.  
[http://web.freegeek.org/howto/deadtrees/triage-2.pdf pdf version].
 
  
[[Category:Prebuild]]
+
To put this in context, there are also wiki versions of the general System Evaluation 1 and 2 overview flow charts:
 +
*[[System Evaluation 1 Overview]]
 +
*[[System Evaluation 2 Overview]]
 +
 
 +
 
 +
[[Category:Old Prebuild]]

Latest revision as of 15:46, 14 March 2009

There are triage flow charts that we use to determine whether a computer gets kept or recycled.

The triage chart for system evaluation 1 looks for obvious reasons for recycling. If one is found the system is recycled. If not, the system goes on to system evaluation 2 for further inspection.

The triage chart for system evaluation 2 makes a final detemination. If the system is to be recycled, it is passed back to system evaluation 1 for mining.

To put this in context, there are also wiki versions of the general System Evaluation 1 and 2 overview flow charts: