Space Usage Projects

From FreekiWiki
Jump to navigation Jump to search

production shuffle

goals

  • The path to the restrooms behind the Laptops area needs to be fully cleared and handicap-accessible before Geek Fair on August 23rd.
  • Well find space we never thought we had
  • Make it so that Ali will feel lost when she comes back

Dependencies

  • Recycling & Sales will have to help us move a tun of crap.

Committees & Individuals to Include in Discussion

  • Production
  • Facilities

Next Steps

  • Combine the remaining advanced testing functions into one area
    • SCSI HD testing
  • Incorporate enterprise build into regular build
  • Expand "club Mac" into one space
  • Empty out tree house and mezzanine
  • Organize and move the Facilities Maintenance area into the mezzanine.
  • Empty out remaining stuff from old facilities area so that we can scratch our heads when we look at this space.

Reception Revamp

  • Replace floor with stable, durable surface
  • Replace desk with higher, stable desk (desk built)
  • look into new door for between reception and receiving.

Dependencies

  • Liascos family:
    • all supplies collected
    • timeline fitting ours (ASAP)
  • If not, requesting $3000 approval from Board July 2008 to allow for alternate & timely plan
  • convert office supplies area to cafeteria space so we can move cafeteria out from current location

Committees & Individuals to Include in Discussion

  • Inreach (MK, Laurel, Ali, et. al.)
  • Space Cadets (Matteo, et. al.)

Next Steps

  • Contact Michelle Liascos for update on their progress, timeline
  • Discuss at Space Cadet's meeting July 15th
    • If a go, pick a weekend to complete floor while closed on a weekend
    • Gather crew: Brian (of Laurel), Erik (of MK), Sean (of FG)
  • If Liascos timeline does NOT work for FG, then:
    • Ask if we can still use donated supplies
    • Contact Erik for logistics of doing it with his crew (budget, supplies, etc.)
    • Either work on weekend, or create temporary donations station and help volunteers log/check-in elsewhere (cafeteria?)
  • Clear out/move Cafeteria
  • Remove dry-erase board
  • Cut hole in cafeteria wall and finish edges
  • Move desk and 1 FD computer (or new computer) to new "Donations" counter

Class Room

  • class room needs to be dampend or something

Dependencies

Committees & Individuals to Include in Discussion

Next Steps

  • include individual commitments, progress with these commitments, and a timeline for checking-in


Name of Project

  • Description of project

Dependencies

Committees & Individuals to Include in Discussion

Next Steps

  • include individual commitments, progress with these commitments, and a timeline for checking-in

EXAMPLE PROJECT

Cafeteria Al Fresco

  • This project will move the cafeteria to the roof. By moving the cafeteria to the roof volunteers will have access to sunshine and fresh air as well as a relaxing place to take a break.

Dependencies

  • get Council approval
  • update budget for third quarter
  • Building a shelter on the roof to accommodate volunteers during the rainy season
  • Designing and constructing an elevator that goes from the ground floor up to the roof
  • acquiring materials
  • who will build it?

Committees & Individuals to Include in Discussion

  • Inreach deals with Volunteer Rewards
  • Action deals with the physical building
  • landlord
  • other tenants

Next Steps

  • Moving the tables & chairs to the roof
  • Sally will do this as soon as the elevator is constructed. She will poke elevator builder.
  • Getting the refrigerator up to the roof
  • George will do this as soon as the elevator is constructed.
  • Get an enormous flat-panel TV so volunteers can watch FOX news during their break
  • John will ask friend about where to get this. He will do this by 5/30/08.
  • Note from John - I've asked my friend and he's looking around and will get back to me next week.