:'''Located''' in the Warehouse, next to the door from Pre Build. | :'''Located''' in the Warehouse, next to the door from Pre Build. | ||
:'''Serves''' | :'''Serves''' | ||
− | :'''Thermostat''' is | + | :'''Thermostat''' is programmable, on a pillar, near Advanced Recycling (near the east windows). |
− | :'''Model''' | + | :'''Model''' |
:'''Gas''' valves are located at the unit and at the meter.Gas line runs through Black Hole, then along back wall through Eval, Build, Back Stage, and out near rollup door. Facing meters, it is the one on the right. | :'''Gas''' valves are located at the unit and at the meter.Gas line runs through Black Hole, then along back wall through Eval, Build, Back Stage, and out near rollup door. Facing meters, it is the one on the right. | ||
− | :'''Electrical''' switch is at the unit. | + | :'''Electrical''' switch is at the unit. |
:'''Info -'''Gas Unit with no Air Conditioning. | :'''Info -'''Gas Unit with no Air Conditioning. | ||
Line 156: | Line 156: | ||
:'''Located''' in the attic space above Receiving, with air conditioning condenser on roof. | :'''Located''' in the attic space above Receiving, with air conditioning condenser on roof. | ||
:'''Serves''' | :'''Serves''' | ||
− | :'''Thermostat''' is | + | :'''Thermostat''' is programmable, on wall of Receiving. |
:'''Model''' | :'''Model''' | ||
:'''Gas''' | :'''Gas''' | ||
:'''Electric''' Furnace, fed from? | :'''Electric''' Furnace, fed from? | ||
− | :'''Info -''' | + | :'''Info -''' Gas Unit with Air Conditioning |
;UNIT THREE [Advanced Test] | ;UNIT THREE [Advanced Test] | ||
Line 206: | Line 206: | ||
:'''Model''' | :'''Model''' | ||
:'''Gas''' | :'''Gas''' | ||
− | :'''Electric''' with air conditioning. Condenser located on roof | + | :'''Electric''' with air conditioning. Condenser located on roof. |
+ | :'''Info -''' | ||
+ | |||
+ | ;UNIT EIGHT [Server Room] | ||
+ | :'''Located''' in Server Room which is east of Build, north of MacLand. | ||
+ | :'''Serves''' Server Room only | ||
+ | :'''Thermostat''' located in Server Room | ||
+ | :'''Model''' Fujitsu - mini-split | ||
+ | :'''Gas''' | ||
+ | :'''Electric''' Air conditioning only. Condenser located on roof. | ||
:'''Info -''' | :'''Info -''' | ||
Revision as of 13:10, 30 January 2012
These tasks are overseen by the Administrative Services Committee. As of December 2011, facilities & maintenance issues are handled by Darryl Kan.
At one time, there was talk of hiring a facilities maintenance person.
Inspection Checklists
Download and print this detailed checklist each month to make sure that the building is functioning and safe:
Monthly Facility Inspection Checklist
Recent inspections completed: 2/8/11, 4/22/11, 6/2/11, 9/20/11
This is an overview for reference only:
Codes
Contractor List
We have used these contractors more than once as of January 2012.
Locks & Keys
Atlasta Lock & Safe Co
702 Grand Ave
Portland
503-233-8763 (ask for showroom for lock service)
Troy Drog - our regular tech
503-519-0725 cell
Electrical
Christenson Electric Co
Portland
Paul Garcia - sets up jobs
503-419-3300 main
503-887-7098 cell
Heating and Cooling
Honke Heating
Gresham
503-666-3725
Tom Hornoff - 503-209-4035
Glass - Windows and Doors
Eastside Glass Co
Portland
Andy - 971-409-3510
Security Film - makes glass inpenetrable after smashing
Pacific Window Tinting Inc
Portland
Jared Gray - 503-793-5848
Maintenance Logs
HVAC Service
- Honke Heating, Gresham, 503-666-3725; Tom Hornoff 503-209-4035
HVAC Filters
- Air Filter Sales (has many sizes): 1138 SE 10th (at Salmon) 503-233-5101
- They have a variety of sizes that are 20" wide, e.g. 20 x 20, 20 x 24, 20 x 25.
- You can order custom sizes ahead of time, or make your own.
- e.g. To make (2) 27 x 30 filters, buy (3) standard 20 x 30 and cut one up into two 7 x 30 pieces.
- Hankins (True Value) Hardware 1720 SE Hawthorne 503-236-2372
- They have 20 x 20 and 20 x 24
- Fred Meyer - has common sizes
Note: air filters measure out to 1/2 inch less than nominal size.
- Filter Log
- Filters should be changed at least 2 times per year.
- They're inspected during Monthly Facility Inspections, and changed as necessary.
- Evaluating Filter Condition
- If the filter is solid gray (on the inlet side), change it.
- If the filter is dirty but not solid gray, clean it (shake out, blow out with air compressor, wash aluminum frame with water / let dry).
Area of Free Geek | Size | Location of Filter | Status / Date | Notes |
Warehouse | 27x30 | South wall near Pre Build | Replaced Sept 2011 | Custom size, need to scrunch filter into place to install (don't use metal frame filter) |
Advanced Test | 13x21 | Treehouse (west side) | Replaced June 2011 | Washable Aluminum frame (custom size) |
Receiving | 20x20 | Receiving on ceiling | Replaced Sept 2011 | New HVAC installed to replace defunct one Oct 2010. Unit is upstairs above Receiving |
Classroom / Laptops | 20x24 | Above Fancy Bath | Replaced Sept 2011 | |
Main Hallway | 20x25 | Roof | Replaced Sept 2011 | Need to bend filter to install (don't use metal frame filter) |
Store | 20x20 | Roof | Replaced Sept 2011 | Need to bend filter to install (don't use metal frame filter) |
South Side of Building (downstairs & upstairs) | 20x20 --- need 2 | Wine Cellar (north wall) | Replaced Sept 2011 | Ducts added for Wine Cellar/Esc Hatch/Big Office Oct 2010 |
Fire Extinguishers
- Vendor
- Sanderson's Safety and Supply
- 1101 SE 3rd Ave
- Portland, OR 97214
- (503) 238-5700
- Fire Extinguisher Log
- Inspection tags good for one year. Sanderson used to automatically schedule yearly inspections, but we needed to call them in January 2012 to set up an inspection.
Location | Type | Professional Inspection Date |
Recycling | ABC | January 2012 (replaced) |
Advanced Test | ABC | January 2012 (replaced) |
Pre-Build (Basic Test area) | ABC | January 2012 (replaced) |
Small Kitchen | ABC | January 2012 (replaced) |
Server Room | ABC | January 2012 |
Classroom/Laptops | ABC | January 2012 |
Big Kitchen | ABC | January 2012 |
Store (storage room) | ABC | January 2012 |
Big Office | ABC | January 2012 |
Wine Cellar | ABC | January 2012 |
HVAC UNIT INFO
units listed from north to south
- UNIT ONE [Warehouse]
- Located in the Warehouse, next to the door from Pre Build.
- Serves
- Thermostat is programmable, on a pillar, near Advanced Recycling (near the east windows).
- Model
- Gas valves are located at the unit and at the meter.Gas line runs through Black Hole, then along back wall through Eval, Build, Back Stage, and out near rollup door. Facing meters, it is the one on the right.
- Electrical switch is at the unit.
- Info -Gas Unit with no Air Conditioning.
- UNIT TWO [Receiving]
- Located in the attic space above Receiving, with air conditioning condenser on roof.
- Serves
- Thermostat is programmable, on wall of Receiving.
- Model
- Gas
- Electric Furnace, fed from?
- Info - Gas Unit with Air Conditioning
- UNIT THREE [Advanced Test]
- Located on ceiling above Eval.
- Serves
- Thermostat Programmable, located on East wall of Eval II.
- Model - Day & Night - 394GAW060175
- Gas
- Electric furnace, fed from panel on north wall of eval.
- Info - Air conditioning?
- UNIT FOUR [Store]
- Located above fancy bathroom.
- Serves store
- Thermostat programable, located on north wall of Thrift Store.
- Model
- Gas?
- Electric
- Info - Has air conditioning.
- UNIT FIVE [Admin/Server/Mac/Build]
- Located On roof above Mac Land.
- Serves all space from Reception to Build.
- Thermostat is programable, located on south wall of Lab. Honeywell TH800 Series File:VisionPro Owner manual.pdf
- Model -
- Gas runs across roof, shut offs at unit and meter. Meter at south rollup door is second from left facing meters, same meter feeds other units. (will document which units later).
- Electric
- Info - Gas unit with air conditioning.
- UNIT SIX [Classroom/Laptops]
- Located On roof above Store
- Serves Classroom and Laptop Build
- Thermostat programmable, located on north wall of the classroom near the door to Lab. Honeywell TH800 Series File:VisionPro Owner manual.pdf
- Model
- Gas shut off's at roof unit, and at south rollup door,meter second to left, facing meters, shared by other units (to be documented later).
- Electric
- Info - Gas unit with air conditioning
check drain above store
- UNIT SEVEN [Meeting/Monkey/Kitchen]
- Located in Wine Cellar above Meeting Room.
- Serves meeting room, Monkeyhouse, Lounge, Library, Kitchen
- Thermostat manual, located on west wall in Library, next to Meeting Room door.
- Model
- Gas
- Electric with air conditioning. Condenser located on roof.
- Info -
- UNIT EIGHT [Server Room]
- Located in Server Room which is east of Build, north of MacLand.
- Serves Server Room only
- Thermostat located in Server Room
- Model Fujitsu - mini-split
- Gas
- Electric Air conditioning only. Condenser located on roof.
- Info -
THERMOSTATS
- Locations listed in Unit Info above.
- Batteries in programable thermostats should be changed annually
- Month ?
- Two AAA batteries each
PGE METER INFORMATION
(Listed from left to right when facing meters)
- Meter One, key P-A, account# ends in 8657 7, Service Address: 1711 SE 10th Ave, A
- Meter Two, key P-A, account# ends in 8658 5, Service Address: 1711 SE 10th Ave, B
- Meter Three, Key P-A, account# ends in 8659 3, Service Address: 1731 SE 10th Ave
- Meter Four, key P-A, account# ends in 8660 1, Service Address: 1735 SE 10th Ave
- Meter Five, key P-B, account# ends in 8661 9, Service Address: 1741 SE 10th Ave
- Meter Six, key P-B, services north upstairs (McGuire's other tenants)