Difference between revisions of "Hardware Testing"

From FreekiWiki
Jump to navigation Jump to search
m
Line 10: Line 10:
 
*[[External Hard Drive Testing]] - Making sure HD enclosures work with pre-tested drives.
 
*[[External Hard Drive Testing]] - Making sure HD enclosures work with pre-tested drives.
 
*[[Lcd_monitor_testing]] - Testing LCD displays for burnout, burn-in, and outright failure.
 
*[[Lcd_monitor_testing]] - Testing LCD displays for burnout, burn-in, and outright failure.
*[[Optical Drive Testing 10.04]] - Making sure a disc drive can perform all the functions it's labeled with (Now handled in Prebuild)
+
*[[Optical_Drive_Testing]] - Making sure a disc drive can perform all the functions it's labeled with (Now handled in Prebuild)
 
*[[Video Card Testing]] - Installing a video card into a test bed to verify it's functionality and specifications.
 
*[[Video Card Testing]] - Installing a video card into a test bed to verify it's functionality and specifications.
  

Revision as of 15:39, 5 July 2012

This is a draft of a new or in-progress document, and is likely to have a few people specifically working on it. You may wish to check in on the discussion page to see what the purpose of the document is and who's working on it; then feel free to give this article love and attention if have extra of those things.

Hardware Testing is where we... wait for it... test hardware! Most of the bits that get yanked out of the computers in System Eval end up in Hardware Testing where we make sure they're fit to be reused. Below is a listing of the tasks that we perform in HT and links to the how-to pages for those tasks.

Core Components

  • CPU Testing - Verifying the processor is within our specifications and making sure it works.
  • MotherBoard Testing - Building a basic system around a motherboard and testing for full functionality.
  • RAM Testing - Stressing RAM and ensuring it retains data correctly.

Add-ins and Peripherals

Network Devices

Others

Staff Tasks