Difference between revisions of "Facility"

From FreekiWiki
Jump to navigation Jump to search
m
Line 171: Line 171:
 
[[Category: Space Use]]
 
[[Category: Space Use]]
 
[[Category:Procedures]]
 
[[Category:Procedures]]
 +
[[Category: Environmental Management System]]

Revision as of 18:56, 5 March 2011

These tasks are overseen by the Action Committee.

At one time, there was talk of hiring a facilities maintenance person.

Inspection Checklists

Download and print this detailed checklist each month to make sure that are building is functioning and safe:

Monthly Facility Inspection Checklist

Recent inspections completed: 11/24/09, 2/13/10, 11/18/2010


This is an overview for reference only:

Codes

Maintainance Logs

HVAC Filters

Vendors
Honke Heating, Gresham, 503-666-3725; Tom 503-209-4035
Fred Meyer
True Value Hardware 1720 SE Hawthorne 503-236-2372
Air Filter Sales (uncommon sizes) 1138 SE 10th 503-233-5101
Filter Log
Filters should be changed 2 times per year. Filters are inspected during Monthly Facility Inspections, and can be changed more than twice a year as necessary, or cleaned (shake out, blow out with air compressor, wash aluminum frames with water / let dry).
HEPA Filter?
Area of Free Geek Size Location of Filter Status / Date Notes
Warehouse 27x30 or 27x29 South wall near Pre Build Cleaned 12/2010, Replace by Spring 2011
Advanced Test 13x21 or 12x21 Treehouse (west side) Cleaned 11/2009, Replace by Spring 2011 Washable Aluminum frame
Receiving 20x20 Receiving on ceiling New Oct 2010, Replace by Spring 2011 New HVAC installed to replace defunct one Oct 2010. Unit is upstairs above Receiving
Classroom / Laptops 20x24 Above Fancy Bath Cleaned 12/2010, Replace by Spring 2011
Main Hallway 20x25 Roof New Summer 2010, Replace by Spring 2011
Store 20x20 Roof New Summer 2010, Replace by Spring 2011
South Side of Building (downstairs & upstairs) 20x20 --- need 2 Wine Cellar (north wall) Changed 12/2010, Replace by Summer 2011 Ducts added for Wine Cellar/Esc Hatch/Big Office Oct 2010

Fire Extinguishers

Vendor
Sanderson's Safety and Supply
1101 SE 3rd Ave
Portland, OR 97214
Fire Extinguisher Log
Inspection tags good for one year. As of 2010, Sanderson's sends someone out every September for the past few years. They have it on their calendar to do the inspection.
Location Type Inspection Date
Recycling ABC September 2010 (re-charged)
Advanced Test ABC September 2010 (inspected)
Pre-Build (Basic Test area) ABC September 2010 (inspected)
Small Kitchen ABC December 2010 (re-charged)
Server Room ABC September 2010 (inspected)
Classroom/Laptops ABC September 2010 (inspected)
Big Kitchen ABC September 2010 (inspected)
Store (storage room) ABC September 2010 (inspected)
Big Office ABC September 2010 (inspected)
Wine Cellar ABC September 2010 (inspected)

HVAC UNIT INFO

units listed from north to south

UNIT ONE [Warehouse]
Located in the Warehouse, next to the door from Pre Build.
Serves
Thermostat is manual, on west side of a pillar, near the front, obscured by shelving.
Model Day & Night Co. Model 394GAW060175
Gas valves are located at the unit and at the meter.Gas line runs through Black Hole, then along back wall through Eval, Build, Back Stage, and out near rollup door. Facing meters, it is the one on the right.
Electrical switch is at the unit. Fed from ?
Info -Gas Unit with no Air Conditioning.
UNIT TWO [Receiving]
Located in the attic space above Receiving, with air conditioning condenser on roof.
Serves
Thermostat is programable, on west wall of Receiving.
Model
Gas
Electric Furnace, fed from?
Info - Currently disabled
UNIT THREE [Advanced Test]
Located on ceiling above Eval.
Serves
Thermostat Programmable, located on East wall of Eval II.
Model - Day & Night - 394GAW060175
Gas
Electric furnace, fed from panel on north wall of eval.
Info - Air conditioning?
UNIT FOUR [Store]
Located above fancy bathroom.
Serves store
Thermostat programable, located on north wall of Thrift Store.
Model
Gas?
Electric
Info - Has air conditioning.
UNIT FIVE [Admin/Server/Mac/Build]
Located On roof above Mac Land.
Serves all space from Reception to Build.
Thermostat is programable, located on south wall of Lab. Honeywell TH800 Series File:VisionPro Owner manual.pdf
Model -
Gas runs across roof, shut offs at unit and meter. Meter at south rollup door is second from left facing meters, same meter feeds other units. (will document which units later).
Electric
Info - Gas unit with air conditioning.
UNIT SIX [Classroom/Laptops]
Located On roof above Store
Serves Classroom and Laptop Build
Thermostat programmable, located on north wall of the classroom near the door to Lab. Honeywell TH800 Series File:VisionPro Owner manual.pdf
Model
Gas shut off's at roof unit, and at south rollup door,meter second to left, facing meters, shared by other units (to be documented later).
Electric
Info - Gas unit with air conditioning

check drain above store

UNIT SEVEN [Meeting/Monkey/Kitchen]
Located in Wine Cellar above Meeting Room.
Serves meeting room, Monkeyhouse, Lounge, Library, Kitchen
Thermostat manual, located on west wall in Library, next to Meeting Room door.
Model
Gas
Electric with air conditioning. Condenser located on roof?
Info -

THERMOSTATS

Locations listed in Unit Info above.
Batteries in programable thermostats should be changed annually
Month ?
Two AAA batteries each

PGE METER INFORMATION

(Listed from left to right when facing meters)

Meter One, key P-A, account# ends in 8657 7, Service Address: 1711 SE 10th Ave, A
Meter Two, key P-A, account# ends in 8658 5, Service Address: 1711 SE 10th Ave, B
Meter Three, Key P-A, account# ends in 8659 3, Service Address: 1731 SE 10th Ave
Meter Four, key P-A, account# ends in 8660 1, Service Address: 1735 SE 10th Ave
Meter Five, key P-B, account# ends in 8661 9, Service Address: 1741 SE 10th Ave
Meter Six, key P-B, services north upstairs (McGuire's other tenants)