Facility
These tasks are overseen by the Action Committee.
At one time, there was talk of hiring a facilities maintenance person.
Inspection Checklists
Download and print this detailed checklist each month to make sure that are building is functioning and safe:
Monthly Facility Inspection Checklist
Recent inspections completed: 11/24/09, 2/13/10, 11/18/2010
This is an overview for reference only:
Codes
Maintainance Logs
HVAC Filters
- Vendors
- Honke Heating, Gresham, 503-666-3725; Tom 503-209-4035
- Fred Meyer
- True Value Hardware 1720 SE Hawthorne 503-236-2372
- Air Filter Sales (uncommon sizes) 1138 SE 10th 503-233-5101
- Filter Log
- Filters should be changed 2 times per year. Filters are inspected during Monthly Facility Inspections, and can be changed more than twice a year as necessary, or cleaned (shake out, blow out with air compressor, wash aluminum frames with water / let dry).
- HEPA Filter?
Area of Free Geek | Size | Location of Filter | Status / Date | Notes |
Warehouse | 27x30 or 27x29 | South wall near Pre Build | Cleaned 12/2010, Replace by Spring 2011 | |
Advanced Test | 13x21 or 12x21 | Treehouse (west side) | Cleaned 11/2009, Replace by Spring 2011 | Washable Aluminum frame |
Receiving | 20x20 | Receiving on ceiling | New Oct 2010, Replace by Spring 2011 | New HVAC installed to replace defunct one Oct 2010. Unit is upstairs above Receiving |
Classroom / Laptops | 20x24 | Above Fancy Bath | Cleaned 12/2010, Replace by Spring 2011 | |
Main Hallway | 20x25 | Roof | New Summer 2010, Replace by Spring 2011 | |
Store | 20x20 | Roof | New Summer 2010, Replace by Spring 2011 | |
South Side of Building (downstairs & upstairs) | 20x20 --- need 2 | Wine Cellar (north wall) | Changed 12/2010, Replace by Summer 2011 | Ducts added for Wine Cellar/Esc Hatch/Big Office Oct 2010 |
Fire Extinguishers
- Vendor
- Sanderson's Safety and Supply
- 1101 SE 3rd Ave
- Portland, OR 97214
- Fire Extinguisher Log
- Inspection tags good for one year. As of 2010, Sanderson's sends someone out every September for the past few years. They have it on their calendar to do the inspection.
Location | Type | Inspection Date |
Recycling | ABC | September 2010 (re-charged) |
Advanced Test | ABC | September 2010 (inspected) |
Pre-Build (Basic Test area) | ABC | September 2010 (inspected) |
Small Kitchen | ABC | December 2010 (re-charged) |
Server Room | ABC | September 2010 (inspected) |
Classroom/Laptops | ABC | September 2010 (inspected) |
Big Kitchen | ABC | September 2010 (inspected) |
Store (storage room) | ABC | September 2010 (inspected) |
Big Office | ABC | September 2010 (inspected) |
Wine Cellar | ABC | September 2010 (inspected) |
HVAC UNIT INFO
units listed from north to south
- UNIT ONE [Warehouse]
- Located in the Warehouse, next to the door from Pre Build.
- Serves
- Thermostat is manual, on west side of a pillar, near the front, obscured by shelving.
- Model Day & Night Co. Model 394GAW060175
- Gas valves are located at the unit and at the meter.Gas line runs through Black Hole, then along back wall through Eval, Build, Back Stage, and out near rollup door. Facing meters, it is the one on the right.
- Electrical switch is at the unit. Fed from ?
- Info -Gas Unit with no Air Conditioning.
- UNIT TWO [Receiving]
- Located in the attic space above Receiving, with air conditioning condenser on roof.
- Serves
- Thermostat is programable, on west wall of Receiving.
- Model
- Gas
- Electric Furnace, fed from?
- Info - Currently disabled
- UNIT THREE [Advanced Test]
- Located on ceiling above Eval.
- Serves
- Thermostat Programmable, located on East wall of Eval II.
- Model - Day & Night - 394GAW060175
- Gas
- Electric furnace, fed from panel on north wall of eval.
- Info - Air conditioning?
- UNIT FOUR [Store]
- Located above fancy bathroom.
- Serves store
- Thermostat programable, located on north wall of Thrift Store.
- Model
- Gas?
- Electric
- Info - Has air conditioning.
- UNIT FIVE [Admin/Server/Mac/Build]
- Located On roof above Mac Land.
- Serves all space from Reception to Build.
- Thermostat is programable, located on south wall of Lab. Honeywell TH800 Series File:VisionPro Owner manual.pdf
- Model -
- Gas runs across roof, shut offs at unit and meter. Meter at south rollup door is second from left facing meters, same meter feeds other units. (will document which units later).
- Electric
- Info - Gas unit with air conditioning.
- UNIT SIX [Classroom/Laptops]
- Located On roof above Store
- Serves Classroom and Laptop Build
- Thermostat programmable, located on north wall of the classroom near the door to Lab. Honeywell TH800 Series File:VisionPro Owner manual.pdf
- Model
- Gas shut off's at roof unit, and at south rollup door,meter second to left, facing meters, shared by other units (to be documented later).
- Electric
- Info - Gas unit with air conditioning
check drain above store
- UNIT SEVEN [Meeting/Monkey/Kitchen]
- Located in Wine Cellar above Meeting Room.
- Serves meeting room, Monkeyhouse, Lounge, Library, Kitchen
- Thermostat manual, located on west wall in Library, next to Meeting Room door.
- Model
- Gas
- Electric with air conditioning. Condenser located on roof?
- Info -
THERMOSTATS
- Locations listed in Unit Info above.
- Batteries in programable thermostats should be changed annually
- Month ?
- Two AAA batteries each
PGE METER INFORMATION
(Listed from left to right when facing meters)
- Meter One, key P-A, account# ends in 8657 7, Service Address: 1711 SE 10th Ave, A
- Meter Two, key P-A, account# ends in 8658 5, Service Address: 1711 SE 10th Ave, B
- Meter Three, Key P-A, account# ends in 8659 3, Service Address: 1731 SE 10th Ave
- Meter Four, key P-A, account# ends in 8660 1, Service Address: 1735 SE 10th Ave
- Meter Five, key P-B, account# ends in 8661 9, Service Address: 1741 SE 10th Ave
- Meter Six, key P-B, services north upstairs (McGuire's other tenants)