Difference between revisions of "Distro/irc20050927"

From FreekiWiki
Jump to navigation Jump to search
m (late agenda items)
(link to progress on cd building documentation)
Line 26: Line 26:
  
 
vagrant:
 
vagrant:
* document freekbox3 installer CD build cycle
+
* document [[Distro_CD_Builds|freekbox3 installer CD build cycle]]
 
* hand-roll package repository scripts until a better method is devised.
 
* hand-roll package repository scripts until a better method is devised.
  

Revision as of 09:12, 26 September 2005

  • date: Sep 27, 2005
  • checkin time: 7pm PDT -0700 (10pm EDT)
  • meeting time 7:15pm PDT -0700 (10:15pm EDT)
  • meet in irc.freenode.net #freegeek-distro

Agenda

commitments from last meeting:

martin:

  • get tested a freekbox3 package release
  • post instructions to pdx QC process.
  • finish svn, add user access (either ssh or webdav)
  • post log of meeting

scott:

  • install and test a popcon server before next meeting.
  • take to the distro list the question of objectives for CD images.

rob:

  • spend 4 hours over next two weeks helping document putting packages packages in repository (michael wanted to help with this "as long as I can poke you enough where I fail to understand")
  • post summary of meeting

michael:

  • I will email the adoptionteachers list [to arrange a meeting to discuss developing user personae]

vagrant:

matteo:

  • attend next meeting

somebody:

ongoing items:

  • user-oriented-design
  • Prognosis: how is this project looking?
  • Long-term outlook - including definition of objectives, estimation of required work, and timeline
  • hosting our own popularity-contest server
  • Install CD: multi-profile or otherwise?
  • svn repository hosted at svn.freegeek.org ?

late agenda items(may not have time):

  • late items here

log / summary

meeting content should get posted here. some possible useful categories below.

Present

Summary

Full Log

post complete log here.