General Priorities

From FreekiWiki
Revision as of 19:36, 22 May 2007 by Ideath (talk | contribs) (→‎Impact/Effort Grid: move enterprise build to low effort because it's already ongoing)
Jump to navigation Jump to search


Explanation

This is document compares all the program planning sheets and is maintained by the Optimization and Priorities group. It is reviewed and approved by the Free Geek Community Council. It should assist us in deciding which projects to push forward as we expand, and which to cut back on if we need to contract.

The Impact/Effort Grid
This is a tool that we use to help us prioritize possible projects. There are nine cells arranged like a tic tac toe game. The higher the expected net positive impact of the project, the higher it appears on the grid. The higher the effort (usually cost in staff hours) the further to the right it appears. The highest priorities will be the things that appear up and to the left, and the lowest priorities will be the things that appear down and to the right.
At the current time, the only items included in the impact/effort grid are programs that would expand Free Geek's activities. That is, the things we are already doing are not included here. (See sublist "D" below.)
Infinite Resources List
The infiniite resources list takes the items from the impact/effort grid and arranges them into one long list, from highest priority to lowest. The higher something is on the list the more likely we've carefully examined it and compared it to the items surrounding it. The lower the item is on the list, the more likely its exact position should be take with a grain of salt or two. It is called the "infiniite resources list" because we assume that there is enough time and money to do everything on the list (something we know not to be true).
At the current time, we have not put anything onto this list, but we plan to do so at our next meeting.
Sublists
There are several sublists. Each item from the infinite resources list appears only on one sublist. See the notes in the sublist section to see how the items are categorized.

Impact/Effort Grid

(Inside in each box, the order means nothing.)

Low Effort Medium Effort High Effort
High Impact
Medium Impact
Low Impact

Infinite Resources List

Each of these items is assigned a standing committee. It is the responsibility of the standing committee to review the program planning sheet for completeness. Some items may need to be passed to another committee for completion.

  1. Tennis Balls -- Technocrats
  2. Adoption -- Knowledge Bees (X)
  3. Build -- Reuse (X)
  4. Recycling -- Action (X)
  5. Receiving -- Action (X)
  6. Front Desk -- Outreach (X)
  7. Thrift Store -- Reuse (X)
  8. Advanced Testing -- Reuse (X)
  9. Fundraising -- Outreach
  10. Grantwriting -- Outreach
  11. Media Outreach -- Outreach
  12. Facilities Maintenance -- Action
  13. System Administration -- Technocrats
  14. Job Experience Internships -- Knowledge Bees
  15. Education -- Knowledge Bees
  16. Alt build -- Reuse
  17. Computers for Kids -- Knowledge Bees
  18. Corporate Donation w/o vehicle -- Reuse
  19. Corporate Donation w/ vehicle -- Reuse
  20. Movable Storage -- Action
  21. Taking over office space in the South -- C7
  22. Printers -- Reuse
  23. Online Sales -- Reuse
  24. Enterprise Build -- Reuse
  25. Move to a new building -- Outreach
  26. Volunteer Pickups -- Action
  27. Media Lab -- Knowledge Bees
  28. Advanced Receiving -- Reuse
  29. Coders -- Technocrats
  30. Emerging Media -- Knowledge Bees

(X) indicates we are already doing this

Sublists

List A
(whether or not there's $$$)
List B
(need some $$$)
List C
(need all $$$)
List D
(already doing)
List E
(won't do/already done)
  1. Tennis Balls
  2. System Administration
  3. Facilities Maintenance
  4. Education
  5. Alt build
  6. Corporate Donation w/o vehicle
  7. Movable Storage
  8. Taking over office space in the South
  1. Fundraising
  2. Grantwriting
  3. Media Outreach
  4. Job Experience Internships
  5. Computers for Kids
  6. Corporate Donation w/ vehicle
  7. Enterprise Build
  8. Move to a new building
  9. Volunteer Pickups
  10. Media Lab
  11. Advanced Receiving
  12. Coders
  1. Emerging Media

(X) indicates item has been integrated into main lists


Notes on the sublists

List A
Things we would like to do even if we have to actually pay for it ourselves.
Grantwriters and other fundraisers should still look at this list. If something seems fundable, we should still try to get funds for it, allowing us to pursue projects lower on the list.
List B
Things we would like to do only if funds could be raised to pay for part of the cost.
Fundraisers may want to consider matching grants, etc.
List C
Things we would like to do only if funds could be raised to pay for all of the cost.
Fundraisers may want to consider what is completely grantable and may ignore things that are not.
List D
Things we are already doing.
These are being integrated into the impact effort grid and the infinite resources list. This is useful in case we saw a need to drop a program or if a program's existence is threatened. (i.e. Such as if we were faced with ongoing financial losses or something we weren't doing yet is a high enough priority to take the place of a lower priority thing that we are already doing.)
List E
Things that there is general agreement we don't want to do
This can be either because they have already been completed, or because there is no consensus around proceeding with the program or project even if it could be funded, etc.

New items to add

Todo List

Evolution-tasks.png
To-do list for: General Priorities

A lot of these projects are in need of a good fleshing out. Optimus Prime folks are going to try to tackle this, including interviewing folks that have more information and getting their thoughts recorded in the PPS pages. People who are trying to flesh this out are in parentheses

  • System Administration (Martin)
  • Facilities Maintenance (Martin)
  • Enterprise Build (Martin)
  • Open more hours (Ali will interview Dave)
  • Taking over the north office space (Ali)
  • Grantwriting (Ali)
  • Corporate Donations (Matteo)
  • Fundraising (Matteo)
  • Move to a new building (Laurel)
  • Job Experience Interns (Laurel)
  • Taking over the office space in the south (Richard)
  • Printers (Richard)

History